File #: 16-0994    Version: 1 Name: Amendment No. 1, Independent Consultant Agreement for Professional Services - CAW Architects - Foster Central Commissary Project
Type: Agreement or Contract Status: Passed
File created: 5/2/2016 In control: Operations
On agenda: 5/25/2016 Final action: 5/25/2016
Enactment date: 5/25/2016 Enactment #: 16-0717
Title: Approval by the Board of Education of Amendment No. 1, Independent Consultant Agreement between the District and CAW Architects, Palo Alto, CA., for the latter to develop a complete conceptual design of the fa?ade modifications consisting of exterior elevations, material samples, structural sketches, and key details; conduct a design presentation meeting to the District of the proposed fa?ade modifications; obtain District approval of the final design approach and prepare a revision document to the DSA approved set that incorporates these design changes; obtain DSA approval of final design revision, in conjunction with the Foster Central Commissary Project, more specifically delineated in the Scope of Services in Exhibit "A", incorporated herein by reference as though fully set forth, in additional amount not-to exceed $72,530.00, increasing Contract not to exceed cost from $3,499,960.00 to $3,572,490.00. All other terms and conditions of the Agreement remain in full force and effect.
Attachments: 1. 16-0994 Amendment No. 1, Independent Consultant Agreement for Professional Services - CAW Architects - Foster Central Commissary Project
Related files: 17-2416, 18-0293, 14-0304, 18-1824
Contact: Roland.Broach@ousd.org

Title

Approval by the Board of Education of Amendment No. 1, Independent Consultant Agreement between the District and CAW Architects, Palo Alto, CA., for the latter to develop a complete conceptual design of the façade modifications consisting of exterior elevations, material samples, structural sketches, and key details; conduct a design presentation meeting to the District of the proposed façade modifications; obtain District approval of the final design approach and prepare a revision document to the DSA approved set that incorporates these design changes; obtain DSA approval of final design revision, in conjunction with the Foster Central Commissary Project, more specifically delineated in the Scope of Services in Exhibit “A”, incorporated herein by reference as though fully set forth, in additional amount not-to exceed $72,530.00, increasing Contract not to exceed cost from $3,499,960.00 to $3,572,490.00.  All other terms and conditions of the Agreement remain in full force and effect.