File #: 16-0232    Version: 1 Name: Agreement for Architectural Services - Loving and Campos (LCA) Architects - Architectural - Fremont High School Replacement Project
Type: Agreement or Contract Status: Passed
File created: 1/21/2016 In control: Operations
On agenda: 4/13/2016 Final action: 4/13/2016
Enactment date: 4/13/2016 Enactment #: 16-0485
Title: Approval by the Board of Education of Agreement for Architectural Services between District and Loving and Campos (LCA) Architects, Oakland, CA, for the latter to provide master plan, programming, design and engineering services for the new, state-of-the-art Fremont Net Zero Energy (ZNE) High School; scope includes, but is not limited to designing a CHPS performance verified project for 1,200 students maximum; preparing construction documents to be submitted to the Division of State Architect; provide bidding assistance, construction administration and closeout services; modernization of existing buildings; interim housing and potential relocation of the existing health clinic; and project management and procurement of the furniture, fixtures and equipment (FF&E) for the project, in conjunction with the Fremont High School Replacement Project, more specifically delineated in the Scope of Services in Exhibit "A", incorporated herein by reference as though fully set forth, for the period...
Attachments: 1. 16-0232 Agreement for Architectural Services - Loving and Campos (LCA) Architects - Architectural - Fremont High School Replacement Project
Related files: 18-0495, 21-0216, 18-0964, 18-1825, 18-2637, 20-0177, 21-1829, 22-1595
Contact: Lance.Jackson@ousd.org

Title

Approval by the Board of Education of Agreement for Architectural Services between District and Loving and Campos (LCA) Architects, Oakland, CA, for the latter to provide master plan, programming, design and engineering services for the new, state-of-the-art Fremont Net Zero Energy (ZNE) High School; scope includes, but is not limited to designing a CHPS performance verified project for 1,200 students maximum; preparing construction documents to be submitted to the Division of State Architect; provide bidding assistance, construction administration and closeout services; modernization of existing buildings; interim housing and potential relocation of the existing health clinic; and project management and procurement of the furniture, fixtures and equipment (FF&E) for the project, in conjunction with the Fremont High School Replacement Project, more specifically delineated in the Scope of Services in Exhibit “A”, incorporated herein by reference as though fully set forth, for the period commencing March 23, 2016 and concluding no later than December 31, 2020 in an amount not to exceed $5,316,000.00.