25-1858
| 1 | C1.-1 | Public Comment On Closed Session Items | Board, Public Comment - Closed Session Items | Public Comment On Closed Session Items - August 13, 2025. | | |
Not available
|
Not available
|
25-1859
| 1 | J.-1 | Public Comment On All Non-Agenda Items Within the Subject Matter Jurisdiction of the District - August 13, 2025 | Board, Public Comment - Non-Agenda Items | Public Comment On All Non-Agenda Items Within the Subject Matter Jurisdiction of the District - August 13, 2025. | | |
Not available
|
Not available
|
25-1674
| 1 | L.-1 | Agreement Between Owner and Contractor – Native Soil Inc. – Manzanita Elementary School Upper Yard Site Improvement Project – Division of Facilities Planning and Management | Agreement or Contract | Approval by the Board of Education of Agreement Between Owner and Contractor by and between the District and Native Soil Inc., Oakland, CA, for the latter to demolish existing play structures, safety surfacing, basketball hoop poles, and remove existing planter boxes, mulch, and retaining wall adjacent to play structures; install safety surfacing tiles and drainage systems; (New play structure to be installed by others.); perform additional work including preparing walls for murals, tree planting with irrigation and drainage, upgrade to the nature area, and pavement replacement; and as further described in the Bid Form Document 00 31 01, incorporated herein by reference as though fully set forth, for the Manzanita Elementary School Upper Yard Site Improvement Project, in the amount of $430,815.00, which includes a contingency allowance of $53,000.00, as the lowest responsible bidder, rejecting all other bids, if any, with the work anticipated to commence on August 25, 2025, and required to be completed within sixty (60) days, with an anticipated ending of October 24, 2025. | | |
Not available
|
Not available
|
25-1696
| 1 | L.-2 | Construction Agreement Between Owner and Contractor – George E. Masker, Inc. – Prescott Elementary School Site Improvement Project – Division of Facilities Planning and Management | Agreement or Contract | Ratification by the Board of Education of a Construction Agreement Between Owner and Contractor by and between the District and George E. Masker, Inc., Oakland, CA, for the latter to “Prep complete exterior including pressure wash, scrape loose debris, mask windows, remove window screens (if screws have not been previously painted over), Paint screens and reinstall the same day (if screen screws have been painted over screens will be painted in place and "faced off'')” (Option 1), as part of the Prescott Elementary Site Improvement Project, in the amount of $72,000.00, with the work anticipated to commence on June 9, 2025, and scheduled to last until July 1, 2025. | | |
Not available
|
Not available
|
25-1713
| 2 | L.-3 | Customer Agreement and Standard Student Data Privacy Agreement - Volt, Inc. - Technology Services Department | Agreement or Contract | Ratification by the Board of Education of a Customer Agreement (CA) by and between the District and Volt, Inc., Bethesda, MD, for the latter to provide software to enhance security after hours and during weekends, with existing camera feeds, as described in Exhibit A of the Agreement (Sales Order No. 2025-00013), for the period of January 20, 2025, through September 17, 2025, at a cost not to exceed $27,584.00; and a Standard Student Data Privacy Agreement (SDPA), by and between said Parties, defining the terms and conditions of the District’s transmission of or sharing of pupil data with Volt, Inc., and the protection by Volt, Inc., of such data, for the same term as the CA. | | |
Not available
|
Not available
|
25-1724
| 1 | L.-4 | Amendment No. 1, Service Order - Gartner, Inc. - Technology Services Department | Agreement or Contract | Ratification by the Board of Education of Amendment No. 1, Service Order (Order) with Exhibit A - Terms of Service by and between District and Gartner, Inc., Dallas, TX, for the latter to continue to provide information technology research and advisory services, extending the term of the Order from July 1, 2024 to June 30, 2025 through June 30, 2026, for an additional amount not to exceed $50,081.00, increasing the Order not to exceed amount from $48,387.00 to $98,468.00. All other terms and conditions of the Order remain in full force and effect. | | |
Not available
|
Not available
|
25-1726
| 1 | L.-5 | Amendment No. 1, Services Agreement - Be A Mentor. Inc. - Technology Services Department | Agreement or Contract | Ratification by the Board of Education of Amendment No. 1, Services Agreement by and between District and Be a Mentor, Inc., Hayward, CA, for the latter to continue hosting of the Vendor Management System, along with background clearances and subsequent arrest notifications for up to 120 vendors, extending the term of the Agreement from July 1, 2024 through June 30, 2025 through June 30, 2026, in the additional amount of $9,900.00, increasing the not to exceed amount of the Agreement from $9,900.00 to $19,800.00. All other terms and conditions of the Contract remain in full force and effect. | | |
Not available
|
Not available
|
25-1727
| 1 | L.-6 | Change Order No. 2, Agreement Between Owner and Contractor – RF Contractors – Edna Brewer Middle School Flooring Replacement Project – Division of Facilities Planning and Management | Agreement or Contract | Approval by the Board of Education of Change Order No. 2, Agreement Between Owner and Contractor, by and between the District and RF Contractors, Oakland, CA, for the latter to prep flooring prior to installation; furnish and install Armstrong Imperial Texture Tiles and Black Burke Rubber base boards as identified in the PCO No. 2, for the Edna Brewer Middle School Flooring Replacement Project, in the not-to-exceed amount of $28,883.89, increasing the Agreement price from $427,045.26 to $455,929.15. All other terms and conditions of the Agreement remain in full force and effect. | | |
Not available
|
Not available
|
25-1729
| 1 | L.-7 | Change Order No. 1, Agreement Between Owner and Contractor – Stronger Building Services – Chabot Elementary School Main Building & Library Roof Replacement Project – Division of Facilities Planning and Management | Agreement or Contract | Approval by the Board of Education of Change Order No. 1, Agreement Between Owner and Contractor, by and between the District and Stronger Building Services, Berkeley, CA, for the latter to install an overlay of ½” Plywood Decking to the existing roof as identified in the PCO No. 1, for the Chabot Elementary School Main Building & Library Roof Replacement Project, in the not-to-exceed amount of $52,435.08, increasing the Agreement price from $415,000.00 to $467,435.08. All other terms and conditions of the Agreement remain in full force and effect. | | |
Not available
|
Not available
|
25-1731
| 1 | L.-8 | Amendment No. 4, General Services Agreement - Bay Alarm Company - Response & Patrol Services Project - Division of Facilities Planning and Management | Agreement or Contract | Approval by the Board of Education of Amendment No. 4, General Services Agreement by and between the District and Bay Alarm Company, Concord, CA, for the latter to continue to provide unchanged outside patrol services, and twenty-four (24) hour-per-day, seven (7) days per-week burglary alarm response & patrol services to the District, for the Response & Patrol Services Project, in an additional not-to-exceed amount of $226,777.32, increasing Agreement not-to-exceed amount from $805,316.52 to $1,032,093.84, and extending the term of the Agreement from July 1, 2021 through June 30, 2025 to June 30, 2026 (an additional 365 calendar days). All other terms and conditions of the Agreement remain in full force and effect. | | |
Not available
|
Not available
|
25-1736
| 1 | L.-9 | No Cost Services Agreement - Technology Exchange - Technology Services Department | Agreement or Contract | Ratification by the Board of Education of a No Cost Service Agreement by and between the District and Technology Exchange, Oakland, CA, for the latter to collect surplussed computing devices, including Chromebooks, on an ongoing basis throughout the school year; schedule pick-ups with Technology Services Department; document and track surplussed assets; refurbish and redistribute computers to the community, via Technology Services Department, for the term July 1, 2025 to June 30, 2027, at no cost to the District. | | |
Not available
|
Not available
|
25-1743
| 1 | L.-10 | Change Order No. 1, Agreement Between Owner and Contractor – Better Flooring, Inc. – Skyline High School Cafeteria Floor Replacement Project – Division of Facilities Planning and Management | Agreement or Contract | Approval by the Board of Education of Change Order No. 1, Agreement Between Owner and Contractor by and between the District and Better Flooring, Inc., El Dorado Hills, CA, covering the costs with the latter for re-mobilization, return of materials, reordering New Marmoleum Selection and Restocking Fee, as outlined in PCO No. 1, for the Skyline High School Cafeteria Floor Replacement Project, in the not-to-exceed amount of $15,424.00, increasing the not to exceed amount of the Agreement from $100,349.00 to $115,773.00. All other terms and conditions of the Agreement remain in full force and effect. | | |
Not available
|
Not available
|
25-1749
| 1 | L.-11 | Sole Source Exception and Services Agreement with Brigaid, LLC – Nutrition Services Department | Agreement or Contract | Approval by the Board of Education of Resolution No. 2526-0151 - Authorizing Use of Sole Source Exception to Public Bidding (Brigaid, LLC) and approving Services Agreement by and between the District and Brigaid, LLC, Middletown, CT, for the latter to provide six on-the -ground chefs for Culinary Training and Consulting Services, as described in Exhibit A of the Agreement, incorporated herein by reference as though fully set forth, for the District’s Nutrition Services Department, for the period of July 1, 2025 through June 30, 2026, in the amount not to exceed $1,176,500.00. | | |
Not available
|
Not available
|
25-1750
| 1 | L.-12 | Amendment No. 3, Produce, Fresh Fruits and Vegetables Agreement - Pacific Rim Produce - Nutrition Services Department | Agreement or Contract | Approval by the Board of Education of Amendment No. 3, Produce, Fresh Fruits and Vegetables Agreement by and between District and Pacific Rim Produce, Alameda, CA, exercising with the latter the second of two one-year options to renew the Produce, Fresh Fruits and Vegetables Agreement for services, increasing the not to exceed amount of the Agreement by $150,000.00, from $2,350,000.00 to $2,500,000.00, for the period of July 1, 2025 through June 30, 2026. All other terms and conditions of the Agreement remain in full force and effect. | | |
Not available
|
Not available
|
25-1811
| 1 | L.-13 | Amendment No. 1, Services Agreement - TriMark dba Chefs’ Toys - Food Service Kitchen Equipment and Training - Nutrition Services Department | Agreement or Contract | Approval by the Board of Education of Amendment No. 1, Services Agreement [Food Service Kitchen Equipment and Training Service Agreement (IFB #24-145NS] by and between the District and TriMark dba Chefs’ Toys, San Francisco, CA, exercising with the latter the first of two one-year options renewing the Food Service Kitchen Equipment and Training Agreement, for an unchanged amount not to exceed $2,300,000.00, for the period of July 1, 2025 through June 30, 2026. All other terms and conditions of the Agreement remain in full force and effect. | | |
Not available
|
Not available
|
25-1812
| 1 | L.-14 | Amendment No. 1, Services Agreement - Pre-Prepared Meals and Sandwich Products K-12 Meal Program for Nutrition Services - Sysco Food Services, Fremont, CA - Nutrition Service Department | Agreement or Contract | Approval by the Board of Education of Amendment No. 1, Services Agreement (RFP #24-150NS) - Pre-Prepared Meals and Sandwich Products K-12 Meal Program for Nutrition Services by and between District and Sysco Food Services, Fremont, CA, exercising with the latter the first of two one-year options renewing the Agreement for services, increasing the not-to-exceed amount of Agreement by $20,000.00, from $420,000.00 to $440,000.00, for the period of July 1, 2025 to June 30, 2026. All other terms and conditions of the Agreement remain in full force and effect. | | |
Not available
|
Not available
|
25-1897
| 1 | L.-15 | Oakland Unified School District Interim Waste Management Services Agreement – Waste Management of Alameda County, Inc. – Solid Waste Handling & Recycling Services Project – Custodial Services Department | Agreement or Contract | Ratification by the Board of Education of the Oakland Unified School District Interim Waste Management Services Agreement by and between the District and Waste Management of Alameda County, Inc., San Jose, CA, for the latter to provide solid waste handling, recycling, and composting services for the Solid Waste Handling & Recycling Services Project, in the amount of $114,800.00, with the work scheduled to commence on July 1, 2025, and expected to last until August 13, 2025. | | |
Not available
|
Not available
|
25-1970
| 1 | L.-16 | Oakland Unified School District General Services Agreement – Waste Management of Alameda County, Inc. – Solid Waste Handling & Recycling Services Project – Custodial Services Department | Agreement or Contract | Approval by the Board of Education of an Oakland Unified School District General Services Agreement by and between the District and Waste Management of Alameda County, Inc., San Jose, CA, for the latter to provide solid waste handling services, recycling services, composting services, preparation and implementation of comprehensive solid waste management program, including all work described in the detailed pickup schedule attached herein as Exhibit A and the Rate Sheets attached to this Agreement as Exhibit B, incorporated herein by reference as though fully set forth, in the event of a conflict terms and rates set forth in this Agreement shall supersede Exhibit A and Exhibit B in the event of a conflict, with rates expressed in Exhibit B running from August 14th forward, for the Solid Waste Handling & Recycling Services Project, in the amount of $3,675,000.00, with the work scheduled to commence on August 13, 2025, and expected to last until June 30, 2026. | | |
Not available
|
Not available
|
25-1742
| 1 | L.-17 | Services Agreement 2025-2026 - Vik Staffing - Talent / Human Resources Department | Agreement or Contract | Ratification by the Board of Education of a Services Agreement 2025-2026 by and between the District and Vik Staffing, Union City, CA, for the latter to provide meal service and buffet management for District’s New Teacher Institute, over the course of five days for 200-300 attendees, handling every aspect from setup to cleanup, via Talent / Human Resources Department, for the period of July 28, 2025 through August 1, 2025, in an amount not to exceed $7,125.00. | | |
Not available
|
Not available
|
25-1752
| 1 | L.-18 | Services Agreement 2025-2026 - JHH Education Consulting, LLC - Talent / Human Resources Department | Agreement or Contract | Ratification by the Board of Education of a Services Agreement 2025-2026 by and between the District and JHH Education Consulting, LLC, San Francisco, CA, for the latter to provide consulting services to Talent/Human Resources Department as District continues to implement in-house, tuition waived Clear Administrative Services Credential Program; support District’s implementation of an advisory group and the quality assessment of the program design, via Talent / Human Resources Department, for the period of July 1, 2025 through June 30, 2026, in an amount not to exceed $24,750.00. | | |
Not available
|
Not available
|
25-1753
| 1 | L.-19 | Services Agreement 2025-2026 - William L. Winston, Education Consulting LLC - Talent / Human Resources Department | Agreement or Contract | Ratification by the Board of Education of a Services Agreement 2025-2026 by and between the District and William L. Winston, Education Consulting LLC, Oakland, CA, for the latter to ensure that partnership with colleges and universities for new teacher recruitment and pipelines are developed and maintained through development of Memorandums of Understanding, including initiating contact with the designated staff at the college responsible for the MOU, communicating with the college and university partners about the MOU process, the writing of the MOU, and the negotiation of the MOU content, receiving approval from the District's Legal Department, submitting and tracking the MOU through the approval process, via Talent / Human Resources Department, for the period of July 1, 2025 through June 30, 2026, in an amount not to exceed $12,000.00. | | |
Not available
|
Not available
|
25-1807
| 1 | L.-20 | Personnel Report No. 2526-0001 - Talent/Human Resources Department | Personnel Report | Approval by the Board of Education of Personnel Report No. 2526-0001 - Talent/Human Resources Department. | | |
Not available
|
Not available
|
25-1808
| 1 | L.-21 | Memorandum of Understanding and Interagency Agreement - San Diego State University - Talent/Human Resources Department | Agreement or Contract | Approval by the Board of Education of a Memorandum of Understanding and Interagency Agreement (MOU or Agreement) for an Internship and Practica Partnership Program-applying to credentials in TK-12 Teaching, including Multiple Subjects, Single Subjects, Designated Subjects, and Special Education Categories, including Added or Supplementary Authorizations and Early Completion Option; and including Pupil Personnel Services in Communicative Sciences & Disorders, Mental Health & Wellness, Counseling & Guidance, Educational Therapy, Administration, and other Pupil Personnel Services credentials and certifications, as may be specified; and including Fieldwork Experience for Master of Arts or Science and other Graduate-Level Degrees or Certifications with Emphasis in Pupil Personnel Services; and including Fieldwork Experience for Pre- Credential Candidate Undergraduate Students-is entered into by and between Oakland Unified School District (District or OUSD), a Public School District In the State Of California, County Of Alameda, and Trustees of the California State University for San Diego State University (University or SDSU), a California State University, for the term July 1, 2025 through June 30, 2030 at no cost to the District other than for certain Non-Teaching Interns in PPS categories (Article 6/#6), who are not employees of the District but may be allocated stipends (Article 6/#6) drawn from non-profit organizational grants to the District (e.g. Ed Fund), administered by the relevant departments of the District. [See Fiscal Impact] | | |
Not available
|
Not available
|
25-1886
| 1 | L.-22 | Network Agreement [2025-2026] - National Center for Teacher Residencies - Talent/Human Resources Department | Agreement or Contract | Ratification by the Board of Education of a Network Agreement [2025-2026] by and between the District and National Center for Teacher Residencies (NTCR), Inc., Chicago, IL, for the latter to provide ongoing support for the Oakland Teacher Residency Program (Partner), more specifically delineated in Section 4 - NCTR Commitments to Partner of the Agreement:
A. Provide Partner with electronic access to content, data collection and visualization tools, consultation services, communication with NCTR and peer network participants, and other shared knowledge and resources to strengthen Partner’s program design and implementation;
B. Support programs to collect, analyze, and apply findings from surveys to drive program improvement and quality implementation of the residency model;
C. Offer programming focused on program improvement aligned with NCTR Levers;
D. Use research and data to support state and national public policy advocacy efforts aimed at driving the sustainability and expansion of the teacher residency model; and
E. Utilize the NCTR website to support Partner’s efforts in the recruitment of high-quality staff,
via Talent / Human Resources Department, for the period of July 1, 2025 through June 30, 2026, in an amount not to exceed $16,000.00. | | |
Not available
|
Not available
|
25-1171
| 1 | L.-23 | Services Agreement and Data Sharing Agreement- Springboard Collaborative - Summer Learning Programs - Community Schools and Student Services Department | Agreement or Contract | Approval by the Board of Education of a Services Agreement.(SA) and Data Sharing Agreement (DSA) by and between the District and Springboard Collaborative, Philadelphia, PA, for the latter to provide targeted literacy acceleration services in an in-person learning format to 5-week summer programs that combine targeted reading instruction, family workshops, teacher coaching, and incentives to achieve lasting results in literacy and related services, as described in Exhibit A, Agreement: the Scope of Work, incorporated herein by reference as though fully set forth, for the period of June 1, 2025 through June 1, 2026, in an amount not to exceed $386,500.00, and under the Data Sharing Agreement (DSA), the terms and conditions of the District’s transmission of or sharing of pupil data with Springboard Collaborative and the protection by Springboard Collaborative of such data for the same term as the SA, each, via the Community Schools and Student Services Department. | | |
Not available
|
Not available
|
25-1346
| 1 | L.-24 | Grant Award - California Department of Education - California Serves Grant 2025 (7810) - Academics and Instruction Department | Agreement or Contract | Acceptance by the Board of Education of a Grant Award from the California Department of Education, California Serves Grant Program #24-25669-61259-00, in the amount of $499,986.00, to support students to experience civic engagement in and outside of the classroom and earn civic Seal when they fulfill the criteria for success, as described in the Notification, for the period of May 1, 2025 to June 30, 2027, pursuant to the terms and conditions thereof, if any. | | |
Not available
|
Not available
|
25-1662
| 1 | L.-25 | Services Agreement - Rachel Hart - Special Education Department | Agreement or Contract | Approval by the Board of Education of a Services Agreement by and between the District and Rachel Hart, San Leandro, CA, for the latter to provide Speech and Language Services to students with Individualized Education Programs (IEPs), IEP meetings, Progress Reports, Medi-Cal billing; assessment for Special Education, General Case Management duties, communication with school staff, parents, students, outside providers, professional development and all duties associated with the role of the school based Speech and Language Pathologist (SLP) that are legally binding and specified on individual student IEPs, via the Special Education Department, for the period of August 14, 2025 through June 30, 2026, in an amount not to exceed $114,800.00. | | |
Not available
|
Not available
|
25-1728
| 1 | L.-26 | 2025-2026 School Plan for Student Achievement (SPSA) - Acorn Woodland Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Acorn Woodland Elementary School. | | |
Not available
|
Not available
|
25-1730
| 1 | L.-27 | 2025-2026 School Plan for Student Achievement (SPSA) for Allendale Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Allendale Elementary School. | | |
Not available
|
Not available
|
25-1732
| 1 | L.-28 | 2025-2026 School Plan for Student Achievement (SPSA) for Bella Vista Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Bella Vista Elementary School. | | |
Not available
|
Not available
|
25-1746
| 1 | L.-29 | Grant Agreement Letter - Eat.Learn.Play Foundation - Environment, Food, and Garden Programming - Community Schools and Student Services Department | Agreement or Contract | Approval by the Board of Education of a Grant Agreement Letter #16-2025 by and between Eat.Learn.Play Foundation, Oakland, CA, and the District, with the latter accepting $100,000.00 to support Central Kitchen and Education Center’s environment, food, and garden programming, as described in Annex A: Application and Budget, pursuant to the terms and conditions thereof, via the Community Schools and Student Services Department, for the period of July 1, 2025 through June 30, 2026. | | |
Not available
|
Not available
|
25-1747
| 1 | L.-30 | Grant Agreement - Altamont Education Advisory Board - Special Staffing Support: Compost Systems Sustainability Service Corps Fellow - Community Schools and Student Services Department | Agreement or Contract | Approval by the Board of Education of Grant Agreement (Grant#25-33) by and between the Altamont Education Advisory Board (AEAB), Banta, CA, and the District, with the latter accepting $31,000.00, from the AEAB for Special Staffing Support: Compost Systems Sustainability Service Corps Fellow - to be used to contribute to the Center’s work on key issues related to composting and waste prevention, TK-12 youth education and career exposure on these subject; increase the Center’s organizational capacity by taking on critical project-based responsibilities that help build out the staffing infrastructure, for the period of July 1, 2025 through June 30, 2026, pursuant to the terms and conditions thereof. | | |
Not available
|
Not available
|
25-1755
| 1 | L.-31 | 2025-2026 School Plan for Student Achievement (SPSA) for Brookfield Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Brookfield Elementary School. | | |
Not available
|
Not available
|
25-1756
| 1 | L.-32 | 2025-2026 School Plan for Student Achievement (SPSA) for Burckhalter Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Burckhalter Elementary School. | | |
Not available
|
Not available
|
25-1757
| 1 | L.-33 | 2025-2026 School Plan for Student Achievement (SPSA) for Chabot Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Chabot Elementary School. | | |
Not available
|
Not available
|
25-1758
| 1 | L.-34 | 2025-2026 School Plan for Student Achievement (SPSA) for East Oakland Pride Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for East Oakland Pride Elementary School. | | |
Not available
|
Not available
|
25-1759
| 1 | L.-35 | 2025-2026 School Plan for Student Achievement (SPSA) for Cleveland Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Cleveland Elementary School. | | |
Not available
|
Not available
|
25-1760
| 1 | L.-36 | 2025-2026 School Plan for Student Achievement (SPSA) for Crocker Highlands Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Crocker Highlands Elementary School. | | |
Not available
|
Not available
|
25-1761
| 1 | L.-37 | 2025-2026 School Plan for Student Achievement (SPSA) for Greenleaf Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Greenleaf Elementary School. | | |
Not available
|
Not available
|
25-1762
| 1 | L.-38 | 2025-2026 School Plan for Student Achievement (SPSA) for Global Family Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Global Family Elementary School. | | |
Not available
|
Not available
|
25-1763
| 1 | L.-39 | 2025-2026 School Plan for Student Achievement (SPSA) for Emerson Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Emerson Elementary School. | | |
Not available
|
Not available
|
25-1764
| 1 | L.-40 | 2025-2026 School Plan for Student Achievement (SPSA) for Franklin Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Franklin Elementary School. | | |
Not available
|
Not available
|
25-1765
| 1 | L.-41 | 2025-2026 School Plan for Student Achievement (SPSA) for Fruitvale Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Fruitvale Elementary School. | | |
Not available
|
Not available
|
25-1766
| 1 | L.-42 | 2025-2026 School Plan for Student Achievement (SPSA) for Garfield Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Garfield Elementary School. | | |
Not available
|
Not available
|
25-1767
| 1 | L.-43 | 2025-2026 School Plan for Student Achievement (SPSA) for Glenview Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Glenview Elementary School. | | |
Not available
|
Not available
|
25-1768
| 1 | L.-44 | 2025-2026 School Plan for Student Achievement (SPSA) for La Escuelita Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for La Escuelita Elementary School. | | |
Not available
|
Not available
|
25-1769
| 1 | L.-45 | 2025-2026 School Plan for Student Achievement (SPSA) for Grass Valley Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Grass Valley Elementary School. | | |
Not available
|
Not available
|
25-1770
| 1 | L.-46 | 2025-2026 School Plan for Student Achievement (SPSA) for Highland Community School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Highland Community School. | | |
Not available
|
Not available
|
25-1771
| 1 | L.-47 | 2025-2026 School Plan for Student Achievement (SPSA) for Hillcrest Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Hillcrest Elementary School. | | |
Not available
|
Not available
|
25-1772
| 1 | L.-48 | 2025-2026 School Plan for Student Achievement (SPSA) for Laurel Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Laurel Elementary School. | | |
Not available
|
Not available
|
25-1773
| 1 | L.-49 | 2025-2026 School Plan for Student Achievement (SPSA) for Lincoln Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Lincoln Elementary School. | | |
Not available
|
Not available
|
25-1774
| 1 | L.-50 | 2025-2026 School Plan for Student Achievement (SPSA) for Horace Mann Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Horace Mann Elementary School. | | |
Not available
|
Not available
|
25-1775
| 1 | L.-51 | 2025-2026 School Plan for Student Achievement (SPSA) for Markham Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Markham Elementary School. | | |
Not available
|
Not available
|
25-1776
| 1 | L.-52 | 2025-2026 School Plan for Student Achievement (SPSA) for Joaquin Miller Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Joaquin Miller Elementary School. | | |
Not available
|
Not available
|
25-1777
| 1 | L.-53 | 2025-2026 School Plan for Student Achievement (SPSA) for Montclair Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Montclair Elementary School. | | |
Not available
|
Not available
|
25-1778
| 1 | L.-54 | 2025-2026 School Plan for Student Achievement (SPSA) for Peralta Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Peralta Elementary School. | | |
Not available
|
Not available
|
25-1779
| 1 | L.-55 | 2025-2026 School Plan for Student Achievement (SPSA) for Piedmont Avenue Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Piedmont Avenue Elementary School. | | |
Not available
|
Not available
|
25-1780
| 1 | L.-56 | 2025-2026 School Plan for Student Achievement (SPSA) for Redwood Heights Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Redwood Heights Elementary School. | | |
Not available
|
Not available
|
25-1781
| 1 | L.-57 | 2025-2026 School Plan for Student Achievement (SPSA) for Sequoia Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Sequoia Elementary School. | | |
Not available
|
Not available
|
25-1782
| 1 | L.-58 | 2025-2026 School Plan for Student Achievement (SPSA) for Madison Park Academy - Primary Campus | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Madison Park Academy - Primary Campus. | | |
Not available
|
Not available
|
25-1783
| 1 | L.-59 | 2025-2026 School Plan for Student Achievement (SPSA) for Thornhill Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Thornhill Elementary School. | | |
Not available
|
Not available
|
25-1784
| 1 | L.-60 | 2025-2026 School Plan for Student Achievement (SPSA) for Lockwood STEAM Academy | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Lockwood STEAM Academy. | | |
Not available
|
Not available
|
25-1785
| 1 | L.-61 | 2025-2026 School Plan for Student Achievement (SPSA) for Carl B. Munck Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Carl B. Munck Elementary School. | | |
Not available
|
Not available
|
25-1786
| 1 | L.-62 | 2025-2026 School Plan for Student Achievement (SPSA) for Oakland Academy of Knowledge | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Oakland Academy of Knowledge. | | |
Not available
|
Not available
|
25-1787
| 1 | L.-63 | 2025-2026 School Plan for Student Achievement (SPSA) for Hoover Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Hoover Elementary School. | | |
Not available
|
Not available
|
25-1788
| 1 | L.-64 | 2025-2026 School Plan for Student Achievement (SPSA) for Fred T. Korematsu Discovery Academy | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Fred T. Korematsu Discovery Academy. | | |
Not available
|
Not available
|
25-1789
| 1 | L.-65 | 2025-2026 School Plan for Student Achievement (SPSA) for Manzanita SEED Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Manzanita SEED Elementary School. | | |
Not available
|
Not available
|
25-1790
| 1 | L.-66 | 2025-2026 School Plan for Student Achievement (SPSA) for Esperanza Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Esperanza Elementary School. | | |
Not available
|
Not available
|
25-1791
| 1 | L.-67 | 2025-2026 School Plan for Student Achievement (SPSA) for Bridges Academy at Melrose | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Bridges Academy at Melrose. | | |
Not available
|
Not available
|
25-1792
| 1 | L.-68 | 2025-2026 School Plan for Student Achievement (SPSA) for Manzanita Community School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Manzanita Community School. | | |
Not available
|
Not available
|
25-1793
| 1 | L.-69 | 2025-2026 School Plan for Student Achievement (SPSA) for EnCompass Academy | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for EnCompass Academy. | | |
Not available
|
Not available
|
25-1794
| 1 | L.-70 | 2025-2026 School Plan for Student Achievement (SPSA) for Martin Luther King, Jr. Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Martin Luther King, Jr. Elementary School. | | |
Not available
|
Not available
|
25-1795
| 1 | L.-71 | 2025-2026 School Plan for Student Achievement (SPSA) for Prescott Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Prescott Elementary School. | | |
Not available
|
Not available
|
25-1796
| 1 | L.-72 | 2025-2026 School Plan for Student Achievement (SPSA) for International Community School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for International Community School. | | |
Not available
|
Not available
|
25-1797
| 1 | L.-73 | 2025-2026 School Plan for Student Achievement (SPSA) for Think College Now Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Think College Now Elementary School. | | |
Not available
|
Not available
|
25-1798
| 1 | L.-74 | 2025-2026 School Plan for Student Achievement (SPSA) for REACH Academy | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for REACH Academy. | | |
Not available
|
Not available
|
25-1799
| 1 | L.-75 | 2025-2026 School Plan for Student Achievement (SPSA) for Sankofa United Elementary School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Sankofa United Elementary School. | | |
Not available
|
Not available
|
25-1800
| 1 | L.-76 | 2025-2026 School Plan for Student Achievement (SPSA) for Melrose Leadership Academy | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Melrose Leadership Academy. | | |
Not available
|
Not available
|
25-1803
| 1 | L.-77 | Nonpublic, Nonsectarian School, Agency Services Master Contract 2025-26 - Intermountain Deaconess Children’s Services - Special Education Department | Agreement or Contract | Approval by the Board of Education of a Nonpublic, Nonsectarian School/ Agency Services Master Contract 2025-26 by and between the District and Intermountain Deaconess Children’s Services, Helena, MT, for the latter to provide Special Education services, stated in Agreement, required by a student’s Individualized Education Program, for the period of July 1, 2025 through June 30, 2026, via the Special Education Department, in an amount not to exceed $800,000.00. | | |
Not available
|
Not available
|
25-1804
| 1 | L.-78 | Nonpublic, Nonsectarian School, Agency Services Master Contract 2025-26 - Seneca Family of Agencies - Special Education Department | Agreement or Contract | Approval by the Board of Education of a Nonpublic, Nonsectarian School/ Agency Services Master Contract 2025-26 by and between the District and Seneca Family of Agencies, Oakland, CA, for the latter to provide Special Education services, stated in Agreement, required by a student’s Individualized Education Program, for the period of July 1, 2025 through June 30, 2026, via the Special Education Department, in an amount not to exceed $2,000,000.00. | | |
Not available
|
Not available
|
25-1805
| 1 | L.-79 | Nonpublic, Nonsectarian School, Agency Services Master Contract 2025-26 - Spectrum Center - Special Education Department | Agreement or Contract | Approval by the Board of Education of a Nonpublic, Nonsectarian School/ Agency Services Master Contract 2025-26 by and between the District and Spectrum Center, Brentwood, TN, for the latter to provide Special Education services, stated in Agreement, required by a student’s Individualized Education Program, for the period of July 1, 2025 through June 30, 2026, via the Special Education Department, in an amount not to exceed $2,000,000.00. | | |
Not available
|
Not available
|
25-1806
| 1 | L.-80 | Nonpublic, Nonsectarian School, Agency Services Master Contract 2025-26 - Victor Treatment Center dba North Valley School - Special Education Department | Agreement or Contract | Approval by the Board of Education of a Nonpublic, Nonsectarian School/ Agency Services Master Contract 2025-26 by and between the District and Victor Treatment Center dba North Valley School, Chico, CA, for the latter to provide Special Education services, stated in Agreement, required by a student’s Individualized Education Program, for the period of July 1, 2025 through June 30, 2026, via the Special Education Department, in an amount not to exceed $600,000.00. | | |
Not available
|
Not available
|
25-1813
| 1 | L.-81 | 2025-2026 School Plan for Student Achievement (SPSA) for Claremont Middle School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Claremont Middle School. | | |
Not available
|
Not available
|
25-1814
| 1 | L.-82 | 2025-2026 School Plan for Student Achievement (SPSA) for West Oakland Middle School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for West Oakland Middle School. | | |
Not available
|
Not available
|
25-1815
| 1 | L.-83 | 2025-2026 School Plan for Student Achievement (SPSA) for Bret Harte Middle School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Bret Harte Middle School. | | |
Not available
|
Not available
|
25-1816
| 1 | L.-84 | 2025-2026 School Plan for Student Achievement (SPSA) for Edna Brewer Middle School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Edna Brewer Middle School. | | |
Not available
|
Not available
|
25-1817
| 1 | L.-85 | 2025-2026 School Plan for Student Achievement (SPSA) for Montera Middle School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Montera Middle School. | | |
Not available
|
Not available
|
25-1818
| 1 | L.-86 | 2025-2026 School Plan for Student Achievement (SPSA) for Roosevelt Middle School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Roosevelt Middle School. | | |
Not available
|
Not available
|
25-1819
| 1 | L.-87 | 2025-2026 School Plan for Student Achievement (SPSA) for Westlake Middle School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Westlake Middle School. | | |
Not available
|
Not available
|
25-1820
| 1 | L.-88 | 2025-2026 School Plan for Student Achievement (SPSA) for Frick United Academy of Language | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Frick United Academy of Language. | | |
Not available
|
Not available
|
25-1821
| 1 | L.-89 | 2025-2026 School Plan for Student Achievement (SPSA) for United for Success Academy | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for United for Success Academy. | | |
Not available
|
Not available
|
25-1822
| 1 | L.-90 | 2025-2026 School Plan for Student Achievement (SPSA) for Elmhurst United Middle School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Elmhurst Middle School. | | |
Not available
|
Not available
|
25-1823
| 1 | L.-91 | 2025-2026 School Plan for Student Achievement (SPSA) for Urban Promise Academy | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Urban Promise Academy. | | |
Not available
|
Not available
|
25-1824
| 1 | L.-92 | 2025-2026 School Plan for Student Achievement (SPSA) Madison Park Academy - Upper Campus | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Madison Park Academy - Upper Campus. | | |
Not available
|
Not available
|
25-1825
| 1 | L.-93 | 2025-2026 School Plan for Student Achievement (SPSA) for Coliseum College Preparatory Academy | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Coliseum College Preparatory Academy. | | |
Not available
|
Not available
|
25-1826
| 1 | L.-94 | 2025-2026 School Plan for Student Achievement (SPSA) for Castlemont High School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Castlemont High School. | | |
Not available
|
Not available
|
25-1827
| 1 | L.-95 | 2025-2026 School Plan for Student Achievement (SPSA) for Fremont High School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Fremont High School. | | |
Not available
|
Not available
|
25-1828
| 1 | L.-96 | 2025-2026 School Plan for Student Achievement (SPSA) for McClymonds High School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for McClymonds High School. | | |
Not available
|
Not available
|
25-1829
| 1 | L.-97 | 2025-2026 School Plan for Student Achievement (SPSA) for Oakland High School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Oakland High School. | | |
Not available
|
Not available
|
25-1830
| 1 | L.-98 | 2025-2026 School Plan for Student Achievement (SPSA) for Oakland Technical High School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Oakland Technical High School. | | |
Not available
|
Not available
|
25-1831
| 1 | L.-99 | 2025-2026 School Plan for Student Achievement (SPSA) for Skyline High School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Skyline High School. | | |
Not available
|
Not available
|
25-1832
| 1 | L.-100 | 2025-2026 School Plan for Student Achievement (SPSA) for Ralph J. Bunche Academy | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Ralph J. Bunche High School. | | |
Not available
|
Not available
|
25-1833
| 1 | L.-101 | 2025-2026 School Plan for Student Achievement (SPSA) for Dewey Academy | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Dewey Academy. | | |
Not available
|
Not available
|
25-1834
| 1 | L.-102 | 2025-2026 School Plan for Student Achievement (SPSA) for Gateway to College at Laney College | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Gateway to College at Laney College. | | |
Not available
|
Not available
|
25-1835
| 1 | L.-103 | 2025-2026 School Plan for Student Achievement (SPSA) for Emiliano Zapata Street Academy | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Emiliano Zapata Street Academy. | | |
Not available
|
Not available
|
25-1836
| 1 | L.-104 | 2025-2026 School Plan for Student Achievement (SPSA) for Sojourner Truth Independent Study | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Sojourner Truth Independent Study. | | |
Not available
|
Not available
|
25-1837
| 1 | L.-105 | 2025-2026 School Plan for Student Achievement (SPSA) for Life Academy | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Life Academy. | | |
Not available
|
Not available
|
25-1838
| 1 | L.-106 | 2025-2026 School Plan for Student Achievement (SPSA) for MetWest High School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for MetWest High School. | | |
Not available
|
Not available
|
25-1839
| 1 | L.-107 | 2025-2026 School Plan for Student Achievement (SPSA) for Rudsdale Continuation High School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Rudsdale Continuation High School. | | |
Not available
|
Not available
|
25-1840
| 1 | L.-108 | 2025-2026 School Plan for Student Achievement (SPSA) for Oakland International High School | School Plan for Student Achievement | Approval by the Board of Education of the 2025-2026 School Plan for Student Achievement (SPSA) for Oakland International High School. | | |
Not available
|
Not available
|
25-1844
| 1 | L.-109 | Services Agreement 2025-2026 - Elevate Adolescence Programs - Community Schools and Student Services Department | Agreement or Contract | Ratification by the Board of Education of a Services Agreement 2025-2026 by and between the District and Elevate Adolescence Programs, Atlanta, GA, for the latter to offer Girls Rising Strong and Boys Breaking Through Programs that are character-based empowerment programs to serve 40 students across two elementary school sites - Manzanita Community School (20 students) and East Oakland Pride Elementary School (20 students) - through afterschool sessions held twice weekly for 24 weeks that are designed to help adolescents navigate the challenges of growing up with a strong sense of identity, emotional intelligence, and purpose, via Community Schools and Student Services Department, for the period of September 1, 2025 through May 31, 2026, in an amount not to exceed $28,800.00. | | |
Not available
|
Not available
|
25-1845
| 1 | L.-110 | Services Agreement 2025-2026 - STU 212 Music Therapy, Coping & Creativity - Community Schools and Student Services Department | Agreement or Contract | Ratification by the Board of Education of a Services Agreement 2025-2026 by and between the District and STU 212 Music Therapy, Coping & Creativity, Concord, CA, for the latter to provide once weekly after-school music therapy sessions at Madison Park Academy, Elmhurst United, Rudsdale, and Street Academy, serving approximately 80 students, as described in Exhibit A of the Agreement, incorporated herein by reference as though fully set forth, via the Community Schools and Student Services Department, for the period of September 1, 2025 through May 31, 2026, in an amount not to exceed $28,800.00. | | |
Not available
|
Not available
|
25-1846
| 1 | L.-111 | Lease Agreement - Marion Fong - Real Property for Staff and Visitor Parking - Lincoln Elementary School | Agreement or Contract | Ratification by the Board of Education of a Lease Agreement by and between the District and Marion Fong, Oakland, CA, for the latter to lease to District real property at the corner of 11th and Madison, 157-11th (vacant lot), Oakland, CA, for staff and visitors parking for Lincoln Elementary School, for a one year term commencing January 1, 2026 (Commencement Date) and unless sooner terminated under provisions herein, shall end on December 31, 2026; unless terminated by either party, Lease shall automatically renew for one year on the anniversary date of each preceding Term; renewals shall not exceed four (4) renewals for a total cumulative Term of five (5) years, at a rental cost of $1,500.00 per month or for an annual cost not to exceed $18,000.00, with repairs and maintenance and other terms honored by Parties as prescribed in Agreement. | | |
Not available
|
Not available
|
25-1848
| 1 | L.-112 | Grant Award - Oakland Promise - CalKIDS - High School Linked Learning Office | Agreement or Contract | Acceptance by the Board of Education of a CAlKIDS Award, in the amount of up to $90,000.00:
• East Oakland Pride - $20,000
• Elmhurst Middle School - $20,000
• Frick United Academy of Language - $20,000
• Castlemont High School - $20,000
• Student Welcome Center - $10,000
from Oakland Promise, Oakland, CA, to support outreach, communications, and student enrollment/claiming efforts on behalf of families and students across the District at named sites, via High School Linked Learning Office, for the period of July 1, 2025 through June 30, 2026, pursuant to the terms and conditions thereof, if any. | | |
Not available
|
Not available
|
25-1849
| 1 | L.-113 | Grant Award - Opportunity Young Adult Career Pathway Program (OYACPP) Program - Adult and Career Education Department | Agreement or Contract | Acceptance by the Board of Education of a Grant Award, in the amount of up to $1,940,425.83, from the California Employment Development Department (EDD), Sacramento, CA, to support the District's Opportunity Young Adult Career Pathway Program (OYACPP) - Highway To Work - , for the period of July 1, 2025 through June 30, 2026, via the Oakland Adult and Career Education Department, pursuant to the terms and conditions thereof, if any. | | |
Not available
|
Not available
|
25-1851
| 1 | L.-114 | No Cost Services Agreement and Data Sharing Agreement – SchoolOpsAI – Research, Assessment and Data Department | Agreement or Contract | Approval by the Board of Education of a No Cost Services Agreement (NCSA) and a Data Sharing Agreement (DSA) by and between the District and SchoolOpsAI, Oakland, CA, for the latter to aggregate data from District’s student learning and information platforms to provide school leader with data based holistic insights and recommendations on how to better support students, for the period of April 1, 2025 through June 30, 2026, at no cost to the District, and under the Data Sharing Agreement (DSA), the terms and conditions of the District's transmission of or sharing of pupil data with SchoolOpsAI, and the protection by SchoolOpsAI, of such data for the same term as the NCSA, each, via the Research, Assessment and Data Department. | | |
Not available
|
Not available
|
25-1852
| 1 | L.-115 | Grant Award Notification - California Department of Education - Part C, Early Education Program - Special Education Local Plan Area - Special Education Department | Agreement or Contract | Approval by the Board of Education of a Grant Award from the California Department of Education, for the Part C, Early Education Program Grant, Grant #23-23761-61259-01, in the amount of $205,411.00, to support the Early Education Program, as described in the Notification, via the Special Education Department, for the period of July 1, 2023 to June 30, 2024, pursuant to the terms and conditions thereof, if any. | | |
Not available
|
Not available
|
25-1853
| 1 | L.-116 | Services Agreement – The Regents of the University of California at Berkeley – History-Social Science Project – Academics and Instruction Department | Agreement or Contract | Approval by the Board of Education of a Services Agreement by and between the District and The Regents of the University of California, on behalf of its History Department’s UC Berkeley History-Social Science Project at its Berkeley campus, where teachers will participate in a 2-year series of Professional Developments offered by the University, with services and deliverables, as delineated in Exhibit A of the Agreement, via the Academics and Instruction Department, for the period of August 14, 2025 through June 30, 2027, in an amount not to exceed $73,365.60. | | |
Not available
|
Not available
|
25-1963
| 1 | L.-117 | Award of RFP and Services Agreement - Elite Security Services - Office of the Chief of Staff | Agreement or Contract | Approval by the Board of Education of Award of Bid (RFP) No. 25-161COS and Services Agreement by and between the District and Elite Security Services, Oakland, CA, for the latter to provide an extra layer of unarmed, non-law enforcement on-site security personnel who can monitor the perimeter, entryways, and safe passages to campuses, potential threat assessment and deescalate current safety related issues, focusing on placements at school sites (to provide tier-three, emergency and temporary safety support) as well as School Board and Committee Meetings, for the period of August 11, 2025 through June 30, 2026, in an amount not to exceed $1,000,000.00. | | |
Not available
|
Not available
|
25-1841
| 1 | L.-118 | Order Form/Subscription Agreement - Thomson Reuters - General Counsel | Agreement or Contract | Ratification by the Board of Education of Order Form/Subscription Agreement (Order ID:Q- 09937203) by and between the District and Thomson Reuters, Eagan, MN, for the latter to provide a subscription to Westlaw, an online legal research service used by the Legal Department, for the period of July 16, 2025 through July 16, 2026, in an amount not to exceed $11,460.00. | | |
Not available
|
Not available
|
25-1964
| 1 | L.-119 | ERRATA – Correction By Adopted Legislative File No., Title or Name of Legislative File - Board Assigned 2024-2025 School Year Resolution Number | Resolution | Adoption by the Board of Education of Resolution No. 2526-0176 - ERRATA - Correction By Adopted Legislative File No., Title or Name of Legislative File - Board Assigned 2024-2025 School Year Resolution Number. | | |
Not available
|
Not available
|
25-1652
| 1 | M.-1 | Agreement for Inspector of Record Services for Construction – Anthonio, Inc. – McClymonds High School Turf Field Project - Division of Facilities Planning and Management | Agreement or Contract | Approval by the Board of Education of Agreement for Inspector of Record Services for Construction by and between the District and Anthonio, Inc., Oakland, CA, for the latter to provide Inspector of Record Services for the McClymonds High School Turf Field Project, in the not-to-exceed amount of $21,000.00, which includes a not-to-exceed amount for Additional Services of $4,200.00, with work scheduled to commence on August 14, 2025, and scheduled to last until August 13, 2026. | | |
Not available
|
Not available
|
25-1679
| 1 | M.-2 | Agreement Between Owner and Contractor – DecoTech Systems, Inc. – Franklin Elementary School Security Improvement Project- Division of Facilities Planning and Management | Agreement or Contract | Approval by the Board of Education of Agreement Between Owner and Contractor by and between the District and DecoTech Systems, Inc., Walnut Creek, CA, for the latter to install 23 new security cameras, 3 mini-dome attic stock cameras, furnish and install a new recording server replacing existing one, troubleshoot 3 existing cameras and program all cameras and perform other services, if any, delineated in Bid Form Document 00 31 01, as part of the Franklin Elementary School Security Improvement Project, in the not to exceed amount of $83,900.00, which includes a contingency of $6,000.00, as the lowest responsible bidder, rejecting all other bids, if any, with the work scheduled to commence on August 14, 2025, and required to be completed within ninety (90) days, with a scheduled end date of November 12, 2025. | | |
Not available
|
Not available
|
25-1682
| 1 | M.-3 | General Services Agreement – ACC Environmental Consultants – Ethel Moore Building Demolition Project - Division of Facilities Planning and Management | Agreement or Contract | Ratification by the Board of Education of a General Services Agreement by and between the District and ACC Environmental Consultants, Inc., Oakland, CA, for the latter to conduct a supplemental asbestos and lead survey sampling in connection with the planned Ethel Moore Building Demolition Project, in the not-to-exceed amount of $30,287.50, which includes a not-to-exceed amount of $2,753.50 for Additional Services, pursuant to Resolution No. 2425-0132.1, with the work scheduled to commence on June 26, 2025, and expected to last until December 31, 2026. | | |
Not available
|
Not available
|
25-1684
| 1 | M.-4 | General Services Agreement – ACC Environmental Consultants – Hillside at Castlemont Demolition Project - Division of Facilities Planning and Management | Agreement or Contract | Ratification by the Board of Education of a General Services Agreement by and between the District and ACC Environmental Consultants, Inc., Oakland, CA, for the latter to conduct a supplemental asbestos and lead paint survey with PBC sampling in connection with the planned Hillside at Castlemont Demolition Project, in the not-to-exceed amount of $30,943.00, which includes a not-to-exceed amount of $2,813.00 for Additional Services, pursuant to Resolution No. 2425-0132.1, with the work scheduled to commence on June 26, 2025, and expected to last until December 31, 2026. | | |
Not available
|
Not available
|
25-1686
| 1 | M.-5 | Oakland Unified School District General Services Agreement – ACC Environmental Consultants – Paul Robeson, 1025 2nd Avenue Demolition Project - Division of Facilities Planning and Management | Agreement or Contract | Ratification by the Board of Education of a General Services Agreement by and between the District and ACC Environmental Consultants, Inc., Oakland, CA, for the latter to conduct a supplemental asbestos and lead paint survey with PBC sampling in connection with the planned Paul Robeson, 1025 2nd Avenue Demolition Project, in the not-to-exceed amount of $32,318.00, which includes a not-to-exceed amount of $2,938.00 for Additional Services, pursuant to Resolution No. 2425-0132.1, with the work scheduled to commence on June 26, 2025, and expected to last until December 31, 2026. | | |
Not available
|
Not available
|
25-1687
| 1 | M.-6 | General Services Agreement – ACC Environmental Consultants – Ralph J. Bunche Demolition Project - Division of Facilities Planning and Management | Agreement or Contract | Ratification by the Board of Education of a General Services Agreement by and between the District and ACC Environmental Consultants, Inc., Oakland, CA, for the latter to conduct a supplemental asbestos and lead paint survey with PBC sampling in connection with the planned Ralph J. Bunche Demolition Project, in the not to exceed amount of $53,319.20, which includes a not-to-exceed amount of $4,847.20 for Additional Services, pursuant to Resolution No. 2425-0132.1, with the work scheduled to commence on June 26, 2025, and expected to last until December 31, 2026. | | |
Not available
|
Not available
|
25-1691
| 1 | M.-7 | Amendment No. 12, Agreement for Engineering Services - Jensen Hughes, Inc.- Bella Vista Child Development Center Fire & Intrusion Alarm Project - Division of Facilities Planning and Management | Agreement or Contract | Approval by the Board of Education of Amendment No. 12, Agreement for Engineering Services by and between the District and Jensen Hughes, Inc., Concord, CA, for the latter to provide fire alarm system consulting services and to witness fire and intrusion alarm testing conducted by the installing contractor during the 11-month observation period for the Bella Vista Child Development Center Fire & Intrusion Alarm Project, as further described in Exhibit A of the Amendment, in the additional amount of $5,000.00, increasing the Agreement not-to-exceed amount from $691,172.00 to $696,172.00. All other terms and conditions of the Agreement remain in full force and effect. | | |
Not available
|
Not available
|
25-1711
| 1 | M.-8 | General Services Agreement – ACC Environmental Consultants, Inc. – Fremont High School Modernization Project - Division of Facilities Planning and Management | Agreement or Contract | Approval by the Board of Education of a General Services Agreement by and between the District and ACC Environmental Consultants, Inc., Oakland, CA, for the latter to conduct soil sampling services throughout eight (8) project areas in advance of planned site improvements for the Fremont High School Modernization Project, in the not to exceed amount of $30,862.90, which includes a not-to-exceed amount of $2,723.90 for Additional Services with the work scheduled to commence on August 14, 2025, and expected to last until June 30, 2026. | | |
Not available
|
Not available
|
25-1719
| 1 | M.-9 | Agreement Between Owner and Contractor - DecoTech Systems, Inc. - Brookfield Elementary School Security Improvement Project - Division of Facilities Planning and Management | Agreement or Contract | Approval by the Board of Education of Agreement Between Owner and Contractor by and between the District and DecoTech Systems, Inc., Walnut Creek, CA, for the latter to install 26 new security cameras, replace 1 existing camera, troubleshoot 6 existing security cameras, and provide 4 attic stock cameras as part of the Brookfield Elementary School Security Improvement Project, in the amount of $96,655.00, which includes a contingency of $8,000.00, as the lowest responsible bidder, rejecting all other bids, if any, with the work scheduled to commence on August 14, 2025, and required to be completed within ninety (90) days, with a scheduled end date of November 12, 2025. | | |
Not available
|
Not available
|
25-1720
| 1 | M.-10 | Construction Agreement Between Owner and Contractor – DecoTech Systems, Inc. – Laurel Child Development Center Security Project – Division of Facilities Planning and Management | Agreement or Contract | Ratification by the Board of Education of the Construction Agreement Between Owner and Contractor by and between the District and DecoTech Systems, Inc., Walnut Creek, CA, for the latter to provide and install 2 security cameras (1 panoramic and 1 multi-sensor), as described in Exhibit A of the Agreement, incorporated herein by reference as though fully set forth, for the Laurel Child Development Center Security Project, in the total amount of $11,804.71, with the work scheduled to commence on July 14, 2025, and scheduled to last until August 14, 2025. | | |
Not available
|
Not available
|
25-1722
| 1 | M.-11 | Agreement for Inspector of Record Services for Construction – King Construction Inspection, Inc. – East Oakland Pride Elementary School Electric Vehicle Charger Installation Project - Division of Facilities Planning and Management | Agreement or Contract | Approval by the Board of Education of Agreement for Inspector of Record Services for Construction by and between the District and King Construction Inspection, Inc., Oakland, CA, for the latter to provide Inspector of Record Services as required by the Division of the State Architect (DSA) under Application Number 01-120433, for the East Oakland Pride Elementary School Electric Vehicle Charger Installation Project, in the not-to-exceed amount of $9,999.00, which includes a contingency fee in the amount of $909.00, with work scheduled to commence on August 14, 2025, and scheduled to last until December 31, 2025. | | |
Not available
|
Not available
|
25-1723
| 1 | M.-12 | Agreement Between Owner and Contractor – Data Media Services, Inc. – Lockwood STEAM Elementary School Security Improvement Project - Division of Facilities Planning and Management | Agreement or Contract | Approval by the Board of Education of Agreement Between Owner and Contractor by and between the District and Data Media Services, Inc., Stockton, CA, for the latter to install 29 new security cameras, replacement of 14 existing camera systems and removing 3 cameras as part of the Lockwood STEAM Elementary School Security Improvement Project, in the amount of $129,000.00, which includes a contingency of $13,000.00, as the lowest responsible bidder, rejecting all other bids, if any, with the work scheduled to commence on August 14, 2025, and required to be completed within ninety (90) days, with a scheduled end date of November 12, 2025. | | |
Not available
|
Not available
|
25-1725
| 1 | M.-13 | Construction Agreement Between Owner and Contractor – Tulum Innovative Engineering – Claremont Middle School Kitchen & Cafeteria Fire Repair Project – Division of Facilities Planning and Management | Agreement or Contract | Approval by the Board of Education of a Construction Agreement Between Owner and Contractor by and between the District and Tulum Innovative Engineering, Inc., Oakland, CA, for the latter to remove the existing Notification Appliance Circuit (NAC) panel in the gymnasium, remove wiring and conduit; Install new NAC panel wiring and conduit in accordance with applicable codes and standards, for the Claremont Middle School Kitchen & Cafeteria Fire Repair Project, in the lump-sum amount of $10,680.00, with the work scheduled to commence on August 14, 2025, and expected to last until August 31, 2025. | | |
Not available
|
Not available
|
25-1735
| 1 | M.-14 | Agreement Between Owner and Contractor – Asbestos Management Group of California, Inc., dba AMG – Ralph Bunche and Hillside School Sites Demolition Projects - Division of Facilities Planning and Management | Agreement or Contract | Ratification by the Board of Education of the Agreement Between Owner and Contractor by and between the District and Asbestos Management Group of California. Inc. dba AMG, San Leandro, CA, for the latter to provide demolition of portables including abatement of hazardous materials, as described in Bid Form Document 00 31 01, and Scope of Work - Bid Drawings, each, incorporated herein by reference as though fully set forth, for the Ralph Bunche School Site and Hillside School Site, pursuant to Resolution No. 2425-0132.1, in the not-to-exceed amount of $650,000.00, with the work scheduled to commence on July 14, 2025, and expected to last until October 11, 2025. | | |
Not available
|
Not available
|
25-1737
| 1 | M.-15 | Agreement for Materials Testing and Special Inspection Services - Inspection Services, Inc. - East Oakland Pride Elementary School Electric Vehicle Project - Division of Facilities Planning and Management | Agreement or Contract | Approval by the Board of Education of Agreement for Materials Testing and Special Inspection Services by and between the District and Inspection Services, Inc., Berkeley, CA, for the latter to provide inspection and material testing services for the East Oakland Pride Elementary School Electric Vehicle Project, in the not-to-exceed amount of $3,863.53, which includes a contingency amount of $351.23 for Additional Services, with the work scheduled to commence on August 14, 2025, and scheduled to last until December 31, 2025. | | |
Not available
|
Not available
|
25-1741
| 1 | M.-16 | Amendment No. 2, Agreement for Engineering Services – AGS, Inc. – McClymonds High School Modernization Project – Division of Facilities Planning and Management | Agreement or Contract | Approval by the Board of Education of Amendment No. 2, Agreement for Engineering Services by and between the District and AGS, Inc., Oakland, CA, for the latter to provide unchanged continued construction services at unchanged costs for the McClymonds High School Modernization Project, extending the term of the Agreement from June 23, 2022, through July 31, 2025, to June 30, 2027 (an additional 699 calendar days). All other terms and conditions of the Agreement remain in full force and effect. | | |
Not available
|
Not available
|
25-1744
| 1 | M.-17 | Agreement Between Owner and Contractor – Redgwick Construction Company – ICS-TCN at Cesar Chavez Turf Replacement Project- Division of Facilities Planning and Management | Agreement or Contract | Approval by the Board of Education of Agreement Between Owner and Contractor by and between the District and Redgwick Construction Company, Oakland, CA, for the latter to install synthetic turf and perform site preparation, including demolition, grading, and drainage work, in support of the new turf installation at the ICS-TCN Cesar Chavez Turf Replacement Project, in the amount of $1,114,913.00, which includes a contingency of $150,000.00, as the lowest responsible bidder, rejecting all other bids, if any, with the work anticipated to commence on August 14, 2025, and required to be completed within ninety (90) days, with an anticipated ending of November 12, 2025. | | |
Not available
|
Not available
|
25-1748
| 1 | M.-18 | Agreement Between Owner and Contractor - Redgwick Construction Company - Oakland High School Turf Replacement Project - Division of Facilities Planning and Management | Motion | Approval by the Board of Education of Agreement Between Owner and Contractor by and between the District and Redgwick Construction Company, Oakland, CA, for the latter to install synthetic turf and perform site preparation, including demolition, grading, and drainage work, in support of the new turf installation at the Oakland High School Turf Replacement Project, in the amount of $1,967,300.00, which includes a contingency of $150,000.00, as the lowest responsible bidder, rejecting all other bids, if any, with the work anticipated to commence on August 14, 2025, and required to be completed within ninety (90) days, with an anticipated ending of November 12, 2025. | | |
Not available
|
Not available
|
25-1857
| 1 | N.-1 | Student Board Members' Report - August 13, 2025 | Student Directors' Report | Student Board Members' Report - August 13, 2025:
· Summary of Events/Updates
· Student Leadership & Events
· All City Council (ACC) Work | | |
Not available
|
Not available
|
25-1856
| 1 | O.-1 | Parent and Student Advisory Committee's Report - August 13, 2025 | PSAC Report | Parent and Student Advisory Committee's Report (Verbal only) - August 13, 2025. | | |
Not available
|
Not available
|
25-1860
| 1 | P.-1 | Comments By Collective Bargaining Units - August 13, 2025 | Board, Public Comment - Collective Bargaining Units | Comments By Collective Bargaining Units - August 13, 2025. | | |
Not available
|
Not available
|
25-1314A
| 1 | R.-1 | Declaring Continuing Emergency and Authorizing District Staff to Enter Into Contracts for Emergency Construction Services for the Repair of Dangerous Conditions at Various Sites Via Demolition of Existing Structures | Resolution | Approval by the Board of Education of Resolution No. 2425-0132.1A - Declaring That The Need For Emergency Construction Services For The Repair Of Dangerous Conditions At Various Sites Via Demolition Of Existing Structures Continues To Exist.*
___
*4/5 Vote [5] Required | | |
Not available
|
Not available
|
25-1809
| 1 | S.-1 | Application for Variable Term Waiver - CBEST, BCLAD and Program - California Commission on Teacher Credentialing - Named Employees for School Year 2025-2026 | Resolution | Approval by the Board of Education of Resolution No. 2526-0052- Application for Variable Term Program Waiver - CBEST, BCLAD and Program - California Commission on Teacher Credentialing - Named Employee for School Year 2025-2026:
1. Soltsinansy Hernandez-Contreras, K-5th Garde Bilingual Spanish Teacher, Woodland Elementary School; and
2. Daniel Alba Pedroza, K-5th Grade Bilingual Spanish Teacher, Melrose Leadership Academy Elementary School. | | |
Not available
|
Not available
|
25-1810
| 1 | S.-2 | Application for Provisional Internship Permit – California Commission on Teacher Credentialing – Named Employees for School Year 2025-2026 | Resolution | Approval by the Board of Education of Resolution No. 2526-0051 - Application for Provisional Internship Permit - California Commission on Teacher Credentialing - Named Employees for School Year 2025-2026:
1. Julianne Khouri, 6th-8th Grade Social Science Teacher, Bret Harte Middle School;
2. Joy Suzuki, TK-5th Grade Teacher, Kaiser Early Childhood Center;
3. Alexander Uranga, 9th-12th Grade Art Teacher, Castlemont High School;
4. Daniel Do, 9th-12th Grade English Teacher, Met West High School;
5. Yaquelin Zaragoza Alvarado, K-5th Grade Multiple Subject Teacher, Think College Now Elementary School;
6. Nini Humphrey, K-5th Grade Multiple Subject Teacher, Highland Community Elementary School;
7. Xuefei Wang, 9th-12th Grade English Teacher, Fremont High School;
8. Kathrine Rose, 6th-8th Grade Social Science Teacher, Coliseum College Prep Academy Middle School;
9. Elena Sullivan, 9th-12 Grade English Teacher, Rudsdale Continuation School;
10. Kristen Murakoshi, 9th-12th Grade Social Science Teacher, Sojourner Truth Independent Study School;
11. Julie Wu, K-5th Grade Mild to Moderate Support Needs SDC Teacher, Franklin Elementary School;
12. Samuel Obregon, K-5th Grade Social Science Teacher, Bella Vista Elementary School;
13. Aamir Sarah, 6th-8th Grade Mild to Moderate Support Needs SDC Teacher, Edna Brewer Middle School;
14. Ella Hasty, K-5th Grade Multiple Subject Teacher, Highland Community Elementary School;
15. Omodele Adesanya, 6th-8th Grade Physical Education Teacher, Westlake Middle School;
16. Eiobany Pere-Contreras, K-5th Grade Multiple Subject Teacher, Joaquin Miller Elementary School;
17. Alexandra Hentges, K-5th Grade Multiple Subject Teacher, Joaquin Miller Elementary School;
18. Stefanie Chung, K-5th Grade Multiple Subject Teacher, Cleveland Elementary School;
19. Shiyon Bradford, K-5th Grade Mild/Moderate Support Needs SDC Teacher, Melrose Leadership Academy Elementary School;
20. Natalie Hanson, K-5th Grade Multiple Subject teacher, Lockwood STEAM Elementary School;
21. Lucia Chavez, K-5th Grade Home Economics Teacher, Garfield Elementary School;
22. Andria Kemp, K-5th Grade Social Science Teacher, Emerson Elementary School;
23. Shirley Guan, Extensive Support Needs Teacher, Young Adult Program School;
24. Jonathan Codina, 6th-8th Grade Chemistry Teacher, Montera Middle School;
25. Savannah Hall, K-5th Grade Social Science Teacher, Oakland Academy of Knowledge Elementary School;
26. Jarrod Carroza, 9th-12th Grade Social Science Teacher, Coliseum College Prep Academy High School;
27. Kevein Kunishi, 9th-12th Grade Art Teacher, Fremont High School;
28. Jibrell Fowler, 9th-12th Grade Mild/Moderate Support Needs Teacher, Fremont High School;
29. Karyn Lee, K-5th Grade Social Science Teacher, Martin Luther King Jr. Elementary School;
30. Abas Idiris, 9th-12th Grade Mild/Moderate Support Needs Teacher, Ralph J Bunce Continuation School;
31. Iris Esquivel, 6th-8th Grade Social Science Teacher, Montera Middle School;
32. Jesse Brooks, 6th-8th Grade Social Science Teacher, Frick United Academy of Language Middle School;
33. Miriam Reyes, 9th-12th Grade Social Science Teacher, McClymonds High School;
34. Monica Lopez De Lazcon, K-5th Grade Extensive Support Needs SDC Teacher, Frankling Elementary School;
35. Rebecca Teevan, K-5th Grade Multiple Subject Teacher, Glenview Elementary School;
36. Maya Moss, K-5th Grade Multiple Subject Teacher, Martin Luther King Jr. Elementary School;
37. Patricia Baylis, TK-5th Grade Mild/Moderate Support Needs RSP Teacher, New Highland Community Elementary School;
38. Titilayo Doyeni, K-5th Grade Multiple Subject Teacher, Joaquin Miller Elementary School;
39. Kim Davis, K-5th Grade Multiple Subject Teacher, Markham Elementary School;
40. Cheryl Krake, K-5th Grade Multiple Subject Teacher, Oakland Academy of Knowledge;
41. Judith Silber, K-5th Grade English Teacher, Franklin Elementary School;
42. Merilee Sader, 9th-12th Grade Social Science Teacher, Oakland High School;
43. Laura Esparza-Gonzalez, K-5th Grade Social Science Teacher, Brookfield Elementary School;
44. Brittany Griffin, TK-5th Grade Mild/Moderate Support Needs RSP Teacher, Lockwood STEAM Academy Elementary School;
45. Brandy Ruedas, 9th-12th Grade SDC Mild/Moderate Support Needs Teacher, Oakland Technical High School;
46. Covetta Kirtman, 9th-12th Grade SpEd Extensive Support Needs, Oakland Technical High School;
47. Samuel Duenas, 9th-12th Grade Social Science Teacher, Coliseum College Prep Academy High School;
48. Rosa Del Toro, K-5th Grade Home Economics Teacher, Bridges Academy Elementary School;
49. Nicholas Rowe, K-5th Grade Social Science Teacher, Hillcrest Elementary School;
50. Antenette Smith, K-5th Grade English Teacher, Chabot Elementary School;
51. Itzel Godinez, 6th-8th Grade Multiple Subject Teacher, Roosevelt Middle School;
52. Jacquelynn Nguyen, 6th-8th Grade Social Science Teacher, Roosevelt Middle School;
53. Carlie Stipe, 9th-12th Grade Social Science Teacher, Madison Park Academy High School;
54. Pola Stein, 9th-12th Grade English Teacher, Oakland Technical High School;
55. Stefanye Bowles-Calloway, K-5th Grade SpEd Extensive Support Needs, Franklin Elementary School;
56. Nekeya Murray, 6th-8th Grade Social Science Teacher, Montera Middle School;
57. Aparna Rao, 9th-12th Grade Social Science Teacher, Castlemont High School;
58. Dorcas Rosado-Chan, 6th-8th Grade Social Science Teacher, Frick United Academy of Language Middle School;
59. Stacy Cremer, 6th-8th Grade Mild/Moderate Support Needs Teacher, Frick United Academy of Language Middle School;
60. Daniel Alba Pedroza, K-5th Grade Multiple Subject Teacher, Melrose Leadership Academy Elementary School;
61. Elizabeth Rodriguez, K-5th Social Science Teacher, Greenleaf Elementary School;
62. Karla Parker, K-5th Grade Extensive support Needs Teacher, Chabot Elementary School;
63. Kaitlyn Chen, 6th-8th Grade Foundational Level General Science Teacher, Elmhurst United Middle School;
64. Emma Dougherty, 6th-8th Grade Foundational Level General Science Teacher, Edna Brewer Middle School;
65. Victoria Elias, K-5th Grade Multiple Subject Teacher, Martin Luther King Jr. Elementary School;
66. Jessica Eth, 6th-8th Grade Art Teacher, Frick United Academy of Language Middle School;
67. Ali Faruqbey, 9th-12th Grade Business Teacher, Life Academy High School;
68. Greta Foehr, 6th-8th Grade Multiple Subject Teacher, Frick United Academy of Language Middle School;
69. Jacquelyn Galea, TK-5th Grade Multiple Subject Teacher, Kaiser CDC School;
70. Troy Garrett, K-5th Grade Social Science Teacher, Reach Academy Elementary School;
71. Justin Powell, K-5th Grade Multiple Subject Teacher, Emerson Elementary School;
72. Caroline Park, K-5th Grade Multiple Subject Teacher, Montclair Elementary School;
73. Amari Goss, K-5th Grade Multiple Subject Teacher, Reach Academy Elementary School;
74. Teresa Guardian Espinoza, 6th-8th Grade Social Science Teacher, Frick United Academy of Language Middle School;
75. Katherine Heller, K-5th Grade Multiple Subject Teacher, Fred Korematsu Elementary School;
76. Jacquelin Hernandez, 6th-8th Grade Social Science teacher, Urban Promise Academy Middle School;
77. Jeannette Hernandez, K-5th Grade Multiple Subject Teacher, Lockwood STEAM Academy Elementary School
78. Samesa Hoskin, K-5th Grade Multiple Subject Teacher, Fred Korematsu Elementary School;
79. Bailey Wakefield, K-5th Grade Multiple Subject Teacher, La Escuelita Elementary School;
80. Katie Humpreys, K-5th Grade Multiple Subject Teacher, Reach Academy Elementary School;
81. Jalen Jackson, K-5th Grade Multiple Subject Teacher, Joaquin Miller Elementary School;
82. Landon Treglia, K-5th Grade Multiple Subject Teacher, Fred T Korematsu Discovery Academy;
83. Youssuf Sharifi, K-5th Grade Extensive Support Needs Teacher, Allen | | |
Not available
|
Not available
|
25-1991
| 1 | S.-3 | Amendment, Board Bylaw 9322 - Agenda/Meeting Materials - Jennifer Brouhard, President and Valarie Bachelor, Vice President (First Reading) | Board By-Law | Adoption by the Board of Education of Amendment, Board Bylaw 9322 - Agenda/Meeting Materials, as enumerated in Exhibit A. | | |
Not available
|
Not available
|
25-1855
| 1 | T.-1 | Superintendent's Report - August 13, 2025 | Superintendent's Report | Superintendent's Report - August 13, 2025:
· Summer Highlights,
· School Site Visits on Day One,
· Enrollment Update,
· New Teacher Institute,
· Leadership Institute, and
· Water Quality Update. | | |
Not available
|
Not available
|
25-1854
| 1 | U.-1 | President's Report | President's Report | President’s Report - August 13, 2025. | | |
Not available
|
Not available
|
25-1861
| 1 | V.-1 | Regular Board Member's Report - August 13, 2025 | Regular Board Members Report | Regular Board Member's Report - August 13, 2025. | | |
Not available
|
Not available
|
25-1740
| 1 | W.-1 | Education for Change - Latitude 37.8 High School - Petition and Charter (Renewal) - Grades 9-12 | Charter School Petition | Submission to the Board of Education of Education for Change - Latitude 37.8 High School - Petition and Charter (Renewal) - Grades 9-12 - July 1, 2026 - June 30, 2031, with initial Public Hearing set for (time tbd) P.M., August 27, 2025, pursuant to Education Code Section 47605. | | |
Not available
|
Not available
|