File #: 23-0861    Version: 1 Name: Purchase Order Agreement – Global Modular, Inc. – Santa Fe Elementary School Portables Procurement Project – Division of Facilities Planning and Management
Type: Agreement or Contract Status: Passed
File created: 3/29/2023 In control: Deputy Chief, Facilities Planning and Management
On agenda: 6/21/2023 Final action: 6/21/2023
Enactment date: 6/21/2023 Enactment #: 23-1172
Title: Approval by the Board of Education of Purchase Order Agreement by and between the District and Global Modular, Inc., Atwater, CA, for the latter to provide six (6) refurbished, standard size classroom unit (24'x40') portables (designated as "relocatable buildings" by DSA) for purchase. The refurbished portables shall meet the pre-check design criteria, as specified by DSA (IR PC-6, BU-22), the latest adopted version of the CBC, CCR-Title 24, State Fire Marshall regulations and Federal regulations for accessibility. Vendor shall provide Pre-Check ("PC") drawings to the Architect of Record ("AOR"), with the Division of the State Architect ("DSA") and coordinate with the AOR the submittal of documents for this site specific project, for the Santa Fe Elementary School Portables Procurement Project, in the total amount of $484,400.00, which includes $14,400.00 for delivery of the portables, and $50,000.00 for an allowance for installation costs, with work scheduled to commence on June 22, 2...
Attachments: 1. 23-0861 Purchase Order Agreement – Global Modular, Inc. – Santa Fe Elementary School Portables Procurement Project – Division of Facilities Planning and Management
Contact: kenya.chatman@ousd.org

title

Approval by the Board of Education of Purchase Order Agreement by and between the District and Global Modular, Inc., Atwater, CA, for the latter to provide six (6) refurbished, standard size classroom unit (24'x40') portables (designated as "relocatable buildings" by DSA) for purchase. The refurbished portables shall meet the pre-check design criteria, as specified by DSA (IR PC-6, BU-22), the latest adopted version of the CBC, CCR-Title 24, State Fire Marshall regulations and Federal regulations for accessibility. Vendor shall provide Pre-Check ("PC") drawings to the Architect of Record ("AOR"), with the Division of the State Architect ("DSA") and coordinate with the AOR the submittal of documents for this site specific project, for the Santa Fe Elementary School Portables Procurement Project, in the total amount of $484,400.00, which includes $14,400.00 for delivery of the portables, and $50,000.00 for an allowance for installation costs, with work scheduled to commence on June 22, 2023 and scheduled to last until October 1, 2023.