File #: 23-1134    Version: 1 Name: Agreement Between Owner and Contractor – KM 106 Construction, Inc. – Horace Mann Elementary School Asphalt Removal and Replacement Project – Buildings and Grounds Department
Type: Agreement or Contract Status: Passed
File created: 4/20/2023 In control: Deputy Chief, Facilities Planning and Management
On agenda: 5/24/2023 Final action: 5/24/2023
Enactment date: 5/24/2023 Enactment #: 23-0880
Title: Approval by the Board of Education of an Agreement Between Owner and Contractor by and between the District and KM 106 Construction, Inc., San Francisco, CA, for the latter to provide cut, demolish, and excavate approximately 63,175 SF of failed pavement to depth of 3" and transport spoils to recycling center. Compact existing base rock, then sweeting it up with one inch of class II base rock, apply tack oil along perimeter edges, then provide, place and compact 2.5" of1/2" medium hot-mix asphalt. Note: No Drains or striping are included on this price. Flatwork Remove & Replace: Sawcut, demolish and excavate approximately 1,200 SF of failed pavement to depth of 5" and transport spoils to recycling center. Re-grade and compact subgrade, set forms, dry fit dowels and# 4 reinforcement steel bars at I 2" on-center each way. Pour and finish approximately 1,200 SF of 6" thick concrete slab. Use colorless 3,000 P .S.I. concrete mix with medium broom finish. Excludes application of concr...
Attachments: 1. 23-1134 Agreement Between Owner and Contractor – KM 106 Construction, Inc. – Horace Mann Elementary School Asphalt Removal and Replacement Project – Buildings and Grounds Department
Contact: Kenya.Chatman

Title

Approval by the Board of Education of an Agreement Between Owner and Contractor by and between the District and KM 106 Construction, Inc., San Francisco, CA, for the latter to provide cut, demolish, and excavate approximately 63,175 SF of failed pavement to depth of 3" and transport spoils to recycling center.  Compact existing base rock, then sweeting it up with one inch of class II base rock, apply tack oil along perimeter edges, then provide, place and compact 2.5" of½" medium hot-mix asphalt.  Note: No Drains or striping are included on this price.  Flatwork Remove & Replace: Sawcut, demolish and excavate approximately 1,200 SF of failed pavement to depth of 5" and transport spoils to recycling center.  Re-grade and compact subgrade, set forms, dry fit dowels and# 4 reinforcement steel bars at I 2" on-center each way.  Pour and finish approximately 1,200 SF of 6" thick concrete slab.  Use colorless 3,000 P .S.I. concrete mix with medium broom finish. Excludes application of concrete sealer.  After punch list is complete all warranties must be submitted, for the Horace Mann Elementary School Asphalt Removal and Replacement Project, in the lump sum amount of $326,679.00, which includes a contingency allowance of $35,000.00, as the lowest responsive, responsible bidder, with the work anticipated to commence on May 25, 2023, and to be completed within sixty days (60), with an anticipated ending of July 23, 2023.