File #: 23-1016    Version: 1 Name: Sole Source Exemption to Public Bidding and Agreement Between Owner and Contractor – Tulum Innovative Engineering – Central Office Move Project – Division of Facilities Planning and Management
Type: Agreement or Contract Status: Passed
File created: 4/13/2023 In control: Deputy Chief, Facilities Planning and Management
On agenda: 5/24/2023 Final action: 5/24/2023
Enactment date: 5/24/2023 Enactment #: 23-1053
Title: Approval by the Board of Education of Resolution No. 2223-0118 - Authorizing Use of Sole Source Exception to Public Bidding (Tulum Innovative Engineering) including Agreement Between Owner and Contractor by and between the District and Tulum Innovative Engineering, Oakland, CA, for the latter to provide, among other things, electrical and demolition services to power connections and "whips" to all partitions; remove "whips" from partitions and walls; demolish the circuit wiring back to the panel board of origin; demolish all conduit, MC Cable, and wire to be demolished; and take other actions related electrical items for the Central Office Move Project, in the total amount of $151,880.00, which includes a contingency allowance of $13,000.00, with the work anticipated to commence on or about May 25, 2023, and scheduled to last until September 22, 2023.
Attachments: 1. 23-1016 Sole Source Exemption to Public Bidding and Agreement Between Owner and Contractor – Tulum Innovative Engineering – Central Office Move Project – Division of Facilities Planning and Management
Contact: kenya.chatman@ousd.org

title

Approval by the Board of Education of Resolution No. 2223-0118 - Authorizing Use of Sole Source Exception to Public Bidding (Tulum Innovative Engineering) including Agreement Between Owner and Contractor by and between the District and Tulum Innovative Engineering, Oakland, CA, for the latter to provide, among other things, electrical and demolition services to power connections and "whips" to all partitions; remove "whips" from partitions and walls; demolish the circuit wiring back to the panel board of origin; demolish all conduit, MC Cable, and wire to be demolished; and take other actions related electrical items for the Central Office Move Project, in the total amount of $151,880.00, which includes a contingency allowance of $13,000.00, with the work anticipated to commence on or about May 25, 2023, and scheduled to last until September 22, 2023.