Title:
|
Approval by the Board of Education of an Independent Consultant Agreement Greater Than $90,200 between District and KW Engineering, Oakland, CA, for the latter to provide commissioning systems services (i.e. heating; ventilation; air conditioning (HVAC) systems and controls (CHPS/T24 required); lighting systems and controls; domestic hot water systems; pumping systems; on-site renewable energy systems; review of Owner Representative's Project Requirements (OPR); Review of Basis of Design (BOD); full commissioned systems peer design review; commissioning plan; submittal review; pre-functional tests and checklist, more specifically delineated in the Scope of Services in Exhibit "A", incorporated herein by reference as though fully set forth, for the Foster Educational Leadership Complex Project, commencing April 26, 2018 and concluding no later than October 31, 2019, in an amount not-to-exceed $96,569.00
|