File #: 16-1576    Version: 1 Name: Independent Contractor Agreement for Professional Services - Simplex Grinnell - Sankofa at Washington Expansion – New Construction Project
Type: Agreement or Contract Status: Passed
File created: 6/15/2016 In control: Operations
On agenda: 6/22/2016 Final action: 6/22/2016
Enactment date: 6/22/2016 Enactment #: 16-1031
Title: Approval by the Board of Education of an Independent Contractor Agreement between the District and Simplex Grinnell, Livermore, CA., for the latter to provide supervision to the electrical contractor, modular building fabricator and/or low voltage installer of the fire alarm system during the following critical path periods: Conduit installation, wire pulling, wire continuity, review/testing & Termination/trimming of devise, one technical will be assigned to supervise installation during construction on site and will be p[resent off-site at modular vendor's fabrication shop in Modesto, California; work will be tracked on a T & M basis & Not to Exceed approved fee, in conjunction with the Sankofa at Washington Expansion - New Construction project, more specifically delineated in the Scope of Services in Exhibit "A", incorporated herein by reference as though fully set forth, commencing July 1, 2016 and concluding no later than December 31, 2017, in an amount not-to exceed $11,200.00.
Attachments: 1. 16-1576 Independent Contractor Agreement for Professional Services - Simplex Grinnell - Sankofa at Washington Expansion – New Construction Project

Title

Approval by the Board of Education of an Independent Contractor Agreement between the District and Simplex Grinnell, Livermore, CA., for the latter to provide supervision to the electrical contractor, modular building fabricator and/or low voltage installer of the fire alarm system during the following critical path periods:  Conduit installation, wire pulling, wire continuity, review/testing & Termination/trimming of devise, one technical will be assigned to supervise installation during construction on site and will be p[resent off-site at modular vendor’s fabrication shop in Modesto, California; work will be tracked on a T & M basis & Not to Exceed approved fee, in conjunction with the Sankofa at Washington Expansion - New Construction project, more specifically delineated in the Scope of Services in Exhibit “A”, incorporated herein by reference as though fully set forth, commencing July 1, 2016 and concluding no later than December 31, 2017, in an amount not-to exceed $11,200.00.