File #: 16-0384    Version: 1 Name: Agreement for Architectural Services - Byrens Kim Design Works - Bret Harte Middle School Lighting Upgrades - Prop 39 Project
Type: Agreement or Contract Status: Passed
File created: 2/9/2016 In control: Operations
On agenda: 3/9/2016 Final action: 3/9/2016
Enactment date: 3/9/2016 Enactment #: 16-0351
Title: Approval by the Board of Education of Agreement for Architectural Services between District and Byrens Kim Design Works, Oakland, CA, for the latter to provide implementation design of Prop 39 projects - install occupancy sensors at 24 classrooms DE lamp existing light fixtures at Building A Upstairs Hallway and Building B Ground floor hallways; Replace various MH/HPS/Mercury Vapor exterior lights with bi-level LED lights. (?70 fixtures); and Install new DOC control system to replace existing pneumatic thermostat and control system, expand existing Enlighted control system; - in conjunction with the Bret Harte Middle School Lighting Upgrades - Prop 39 Project, more specifically delineated in the Scope of Services in Exhibit "A", incorporated herein by reference as though fully set forth, for the period commencing March 11, 2016 and concluding December 31, 2016 in an amount not to exceed $24,700.00.
Attachments: 1. 16-0384 Agreement for Architectural Services - Byrens Kim Design Works - Bret Harte Middle School Lighting Upgrades - Prop 39 Project
Contact: Roland.Broach@ousd.org

Title

Approval by the Board of Education of Agreement for Architectural Services between District and Byrens Kim Design Works, Oakland, CA, for the latter to provide implementation design of Prop 39 projects - install occupancy sensors at 24 classrooms DE lamp existing light fixtures at Building A Upstairs Hallway and Building B Ground floor hallways; Replace various MH/HPS/Mercury Vapor exterior lights with bi-level LED lights. (±70 fixtures); and Install new DOC control system to replace existing pneumatic thermostat and control system, expand existing Enlighted control system; - in conjunction with the Bret Harte Middle School Lighting Upgrades - Prop 39 Project, more specifically delineated in the Scope of Services in Exhibit “A”, incorporated herein by reference as though fully set forth, for the period commencing March 11, 2016 and concluding December 31, 2016 in an amount not to exceed $24,700.00.