File #: 16-0382    Version: 1 Name: Agreement for Architectural Services - Byrens Kim Design Works - Oakland Technical High School Lighting Upgrades – Prop 39 Project
Type: Agreement or Contract Status: Passed
File created: 2/9/2016 In control: Operations
On agenda: 3/9/2016 Final action: 3/9/2016
Enactment date: 3/9/2016 Enactment #: 16-0349
Title: Approval by the Board of Education of Agreement for Architectural Services between District and Byrens Kim Design Works, Oakland, CA, for the latter to provide implementation design of Prop 39 projects - expand existing Enlighted control system on the second floor to the first floor of the main building (as specified); install DDC for existing HVAC system in main building (as specified); retrofit Auditorium Single Zone Unit with Variable Air Volume and Demand Control Ventilation capable control (as specified); and replace existing lighting in Auditorium with new lights and control system (+ 65 fixtures), in conjunction with the Oakland Technical High School Lighting Upgrades Project, more specifically delineated in the Scope of Services in Exhibit "A", incorporated herein by reference as though fully set forth, for the period commencing March 11, 2016 and concluding December 31, 2016 in an amount not to exceed $73,000.00.
Attachments: 1. 16-0382 Agreement for Architectural Services - Byrens Kim Design Works - Oakland Technical High School Lighting Upgrades – Prop 39 Project
Contact: Roland.Broach@ousd.org

Title

Approval by the Board of Education of Agreement for Architectural Services between District and Byrens Kim Design Works, Oakland, CA, for the latter to provide implementation design of Prop 39 projects - expand existing Enlighted control system on the second floor to the first floor of the main building (as specified); install DDC for existing HVAC system in main building (as specified); retrofit Auditorium Single Zone Unit with Variable Air Volume and Demand Control Ventilation capable control (as specified); and replace existing lighting in Auditorium with new lights and control system (+ 65 fixtures), in conjunction with the Oakland Technical High School Lighting Upgrades Project, more specifically delineated in the Scope of Services in Exhibit “A”, incorporated herein by reference as though fully set forth, for the period commencing March 11, 2016 and concluding December 31, 2016 in an amount not to exceed $73,000.00.