File #: 15-0864    Version: 1 Name: Award of Bid and Construction Contract - Del Monte Electric Company, Inc. - Bella Vista Elementary School Fire Alarm Project
Type: Resolution Status: Passed
File created: 4/27/2015 In control: Operations
On agenda: 5/27/2015 Final action: 5/27/2015
Enactment date: 5/27/2015 Enactment #: 15-0699
Title: Approval by the Board of Education of Resolution No. 1415-1116 - Award of Bid and Construction Contract between District and Del Monte Electric Company, Inc., Dublin, CA, for the latter as the lowest responsive, responsible bidder and rejecting all other bids, if any, to replace existing fire and intrusion alarm system and install a new fire alarm and a new (Bosch 9412GV4) intrusion alarm system; provide all equipment, conduit, wiring audible/visual heat detectors, connections, and programming, as required for completion in spaces above ceiling and a single manual fire alarm box in a normally occupied location; remove all existing unused wiring / raceway conduit for both systems. in conjunction with the Bella Vista Elementary School Fire Alarm Project, for the period commencing May 28, 2015 and concluding no later than October 28, 2015, in the amount of $684,000.00.
Attachments: 1. 15-0864 Award of Bid and Construction Contract - Del Monte Electric Company, Inc. - Bella Vista Elementary School Fire Alarm Project
Contact: Lance.Jackson@ousd.k12.ca.us
Title
Approval by the Board of Education of Resolution No. 1415-1116 - Award of Bid and Construction Contract between District and Del Monte Electric Company, Inc., Dublin, CA, for the latter as the lowest responsive, responsible bidder and rejecting all other bids, if any, to replace existing fire and intrusion alarm system and install a new fire alarm and a new (Bosch 9412GV4) intrusion alarm system; provide all equipment, conduit, wiring audible/visual heat detectors, connections, and programming, as required for completion in spaces above ceiling and a single manual fire alarm box in a normally occupied location; remove all existing unused wiring / raceway conduit for both systems. in conjunction with the Bella Vista Elementary School Fire Alarm Project, for the period commencing May 28, 2015 and concluding no later than October 28, 2015, in the amount of $684,000.00.