File #: 15-0326    Version: 1 Name: Contract for Repairs, Maintenance or Small Construction Projects - DKB, Inc. - Metwest Educational Center Project
Type: Agreement or Contract Status: Passed
File created: 2/9/2015 In control: Board of Education
On agenda: 3/11/2015 Final action: 3/11/2015
Enactment date: 3/11/2015 Enactment #: 15-0297
Title: Approval by the Board of Education of Contract for Repairs, Maintenance or Small Construction Projects Metwest Educational Center Project between District and DKB, Inc., Woodland, CA, for the latter to furnish materials and labor required to install 3M fire rated blanket around vertical duct at 2nd floor custodian room (A-246) per ASI #64 shaft wall correction; proposal includes 10% contingency, in conjunction with the Metwest Educational Center Project, more specifically delineated in the Scope of Services in Exhibit "A", incorporated herein by reference as though fully set forth, for the period commencing March 11, 2015 and concluding no later than June 11, 2015 in an amount not to exceed $9,886.80.
Attachments: 1. 15-0326 Contract for Repairs, Maintenance or Small Construction Projects - DKB, Inc. - Metwest Educational Center Project
Contact: Timothy.White@ousd.k12.ca.us
Title
Approval by the Board of Education of Contract for Repairs, Maintenance or Small Construction Projects Metwest Educational Center Project between District and DKB, Inc., Woodland, CA, for the latter to furnish materials and labor required to install 3M fire rated blanket around vertical duct at 2nd floor custodian room (A-246) per ASI #64 shaft wall correction; proposal includes 10% contingency, in conjunction with the Metwest Educational Center Project, more specifically delineated in the Scope of Services in Exhibit "A", incorporated herein by reference as though fully set forth, for the period  commencing March 11, 2015 and concluding no later than June 11, 2015 in an amount not to exceed $9,886.80.