File #:
|
25-0358
Version:
1
|
Name:
|
Services Agreement 2024-2025 - ER Plumbing & Construction, Inc. - Nutrition Services Department
|
Type:
|
Agreement or Contract
|
Status:
|
Board, General Consent Report
|
On agenda:
|
3/12/2025
|
Final action:
|
|
Enactment date:
|
|
Enactment #:
|
|
Title:
|
Approval by the Board of Education of a Services Agreement 2024-2025 by and between the District and ER Plumbing & Construction Inc, Oakland, CA, for the latter to demolish and prep kitchen flooring; open kitchen walls to replace all lead-based pipes and fittings, shut-off valves; remove concrete and excavate as needed to remove and replace grease trap, install three floor sinks; install new grease trap underneath 3-compartment sink and connect all floor sinks with new two-inch drains, vents and trap primers, as per code; install two new commercial grade, lead-free, two-handled ADA compliant faucets at 3-compartment sink; install one new commercial grade, lead-free, single-handle, ADA compliant faucet at single compartment sink; install new gas stove with heat proof drain and copper vent to new floor sink; replacement and installation for concrete, as needed; inspection and test existing range hood fire suppression unit by certified specialist, at Allendale Elementary School, via the N...
|
Title
Approval by the Board of Education of a Services Agreement 2024-2025 by and between the District and ER Plumbing & Construction Inc, Oakland, CA, for the latter to demolish and prep kitchen flooring; open kitchen walls to replace all lead-based pipes and fittings, shut-off valves; remove concrete and excavate as needed to remove and replace grease trap, install three floor sinks; install new grease trap underneath 3-compartment sink and connect all floor sinks with new two-inch drains, vents and trap primers, as per code; install two new commercial grade, lead-free, two-handled ADA compliant faucets at 3-compartment sink; install one new commercial grade, lead-free, single-handle, ADA compliant faucet at single compartment sink; install new gas stove with heat proof drain and copper vent to new floor sink; replacement and installation for concrete, as needed; inspection and test existing range hood fire suppression unit by certified specialist, at Allendale Elementary School, via the Nutrition Services Department, for the period of December 13, 2024 through March 31, 2025, in an amount not to exceed $127,665.00.
|