|
Title:
|
Approval by the Board of Education of Construction Agreement Between Owner and Contractor by and between the District and OBR Electric, LLC, Oakland, CA, for the latter to provide labor, material and equipment for corrective base preparation and electrical infrastructure; includes one 20-amp, 208-volt lighting feed and one 120-volt control circuit from the existing panel to the Musco cabinet, including approximately 100 feet of interior 1-inch EMT and 200 feet of exterior underground 2-inch PVC for the Montera Middles School Mini-Pitch site as part of the Montera Middle School Site Improvements Project, in the amount of $73,348.00, which includes a contingency allowance of $6,668.00, with the work anticipated to commence on November 13, 2026, and with an anticipated ending of December 13, 2026.
|