File #: 25-2430    Version: 1 Name: Change Order No. 1, Agreement Between Owner and Contractor – North American Fence & Railing, Inc.- Coliseum College Preparatory Academy Interim Housing Project – Division of Facilities Planning and Management
Type: Agreement or Contract Status: Passed
File created: 9/30/2025 In control: Deputy Chief, Facilities Planning and Management
On agenda: 11/12/2025 Final action: 11/12/2025
Enactment date: 11/12/2025 Enactment #: 25-1917
Title: Approval by the Board of Education of Change Order No. 1, Agreement Between Owner and Contractor by and between the District and North American Fence & Railing, Inc., Oakland, CA, for the latter to: PCO 1: Reinstalled a 10' high chain-link fence with a 1" mesh (22 linear feet) along with a pedestrian gate. Modify the existing pedestrian gate by adding a panic bar and reconfiguring the latch and ram cylinder; and PCO 2: Remove the existing 10' high galvanized chain-link fence with 1" mesh (33 LF) and a 48" wide pedestrian gate. Relocate and install a 7" high chain-link fence with 2" mesh at a new location, reusing the posts, rails, and gate from the original fence, in the not to exceed amount of $12,508.00, increasing the Agreement not to exceed amount from $23,000.00 to $35,508.00, and extending the term of the Agreement from March 27, 2025 through August 30, 2025 to November 30, 2025 (an additional 93 calendar days), for the Coliseum College Preparatory Academy Interim Housing Project...
Attachments: 1. 25-2430 Change Order No. 1, Agreement Between Owner and Contractor – North American Fence & Railing, Inc.- Coliseum College Preparatory Academy Interim Housing Project – Division of Facilities Planning and Management
Related files: 25-0471
Contact: preston.thomas@ousd.org

title

Approval by the Board of Education of Change Order No. 1, Agreement Between Owner and Contractor by and between the District and North American Fence & Railing, Inc., Oakland, CA, for the latter to: PCO 1: Reinstalled a 10’ high chain-link fence with a 1” mesh (22 linear feet) along with a pedestrian gate. Modify the existing pedestrian gate by adding a panic bar and reconfiguring the latch and ram cylinder; and PCO 2: Remove the existing 10’ high galvanized chain-link fence with 1” mesh (33 LF) and a 48” wide pedestrian gate. Relocate and install a 7” high chain-link fence with 2” mesh at a new location, reusing the posts, rails, and gate from the original fence, in the not to exceed amount of $12,508.00, increasing the Agreement not to exceed amount from $23,000.00 to $35,508.00, and extending the term of the Agreement from March 27, 2025 through August 30, 2025 to November 30, 2025 (an additional 93 calendar days), for the Coliseum College Preparatory Academy Interim Housing Project. All other terms and conditions of the Agreement remain in full force and effect.