File #: 10-2217    Version: 1 Name: Professional Services Facilities Contract - Applied Materials & Engineering, Inc. - Life Academy Renovation/Seismic Retrofit Project
Type: Agreement or Contract Status: Passed
File created: 9/14/2010 In control: Facilities Committee
On agenda: Final action: 9/22/2010
Enactment date: 9/22/2010 Enactment #: 10-1775
Title: Approval by the Board of Education of Professional Services Facilities Contract between District and Applied Materials & Engineering, Inc., Oakland, CA, for the latter to provide independent agency (vendor) structural verification on the Life Academy Rehabilitation Project, as required by the Division of State Architect (DSA), to confirm that the existing building was constructed as designed; testing and inspecting fourteen (14) conditions in six (6) zones, pursuant to Scope of Work, incorporated herein by reference as though fully set forth, with the attached proposal incorporated into the Contract to the extent that it is subordinate to and not inconsistent with the contract terms, in conjunction with the Life Academy Renovation/Seismic Retrofit Project, for the period commencing September 23, 2010 and concluding no later than December 12, 2010, in an amount not to exceed $121,160.00.
Attachments: 1. 10-2217 - PROFESSIONAL SERVICES FACILITIES CONTRACT - APPLIED MATERIALS & ENGINEERING, INC. - LIFE ACADEMY RENOVATION/SEISMIC RETROFIT PROJECT
Contact: Timothy.White@ousd.k12.ca.us
Title
Approval by the Board of Education of Professional Services Facilities Contract between District and Applied Materials & Engineering, Inc., Oakland, CA, for the latter to provide independent agency (vendor) structural verification on the Life Academy Rehabilitation Project, as required by the Division of State Architect (DSA), to confirm that the existing building was constructed as designed; testing and inspecting fourteen (14) conditions in six (6) zones, pursuant to Scope of Work, incorporated herein by reference as though fully set forth, with the attached proposal incorporated into the Contract to the extent that it is subordinate to and not inconsistent with the contract terms, in conjunction with the Life Academy Renovation/Seismic Retrofit Project, for the period commencing September 23, 2010 and concluding no later than December 12, 2010, in an amount not to exceed $121,160.00.