Legislation Details

File #: 26-1924    Version: 1 Name: Agreement Between Owner and Contractor – A and B Mechanical, Inc. – Sequoia Elementary School Boiler Replacement Project - Department of Buildings and Grounds
Type: Agreement or Contract Status: Board, General Consent Report
File created: 9/2/2026 In control: Deputy Chief, Facilities Planning and Management
On agenda: 10/14/2026 Final action:
Enactment date: Enactment #:
Title: Approval by the Board of Education of a Bid Award, rejecting all other bids, and an Agreement Between Owner and Contractor by and between the District and A and B Mechanical, Inc., Livermore, CA, for the latter to remove existing steam boiler and install new cast iron sectional steam boiler, with work including demolition of the existing boiler and associated piping, hazmat abatement as needed, rigging and installation of the new boiler, reconnection to existing steam, gas, and electrical services, adaptation of the existing flue system, and full commissioning to confirm proper operation of the new equipment for the Sequoia Elementary School Boiler Replacement Project, in the amount of $160,611.00, as the lowest responsive, responsible bidder, which includes a contingency of $13,500.00 with the work anticipated to commence on October 15, 2026, and required to be completed within sixty (60) days, with an anticipated ending of November 15, 2026.
Attachments: 1. 26-1924 Agreement Between Owner and Contractor – A and B Mechanical, Inc. – Sequoia Elementary School Boiler Replacement Project - Department of Buildings and Grounds
Contact: preston.thomas@ousd.org
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

title

Approval by the Board of Education of a Bid Award, rejecting all other bids, and an Agreement Between Owner and Contractor by and between the District and A and B Mechanical, Inc., Livermore, CA, for the latter to remove existing steam boiler and install new cast iron sectional steam boiler, with work including demolition of the existing boiler and associated piping, hazmat abatement as needed, rigging and installation of the new boiler, reconnection to existing steam, gas, and electrical services, adaptation of the existing flue system, and full commissioning to confirm proper operation of the new equipment for the Sequoia Elementary School Boiler Replacement Project, in the amount of $160,611.00, as the lowest responsive, responsible bidder, which includes a contingency of $13,500.00 with the work anticipated to commence on October 15, 2026, and required to be completed within sixty (60) days, with an anticipated ending of  November 15, 2026.