Legislation Details

File #: 26-0672    Version: 1 Name: Construction Agreement Between Owner and Contractor – Apex Refrigeration Corporation – Skyline High School Freezer Door Installation Project – Nutrition Services Department
Type: Agreement or Contract Status: Board, General Consent Report
File created: 3/12/2026 In control: Deputy Chief, Facilities Planning and Management
On agenda: 4/22/2026 Final action:
Enactment date: Enactment #:
Title: Ratification by the Board of Education of a Construction Agreement Between Owner and Contractor by and between the District and Apex Refrigeration Corporation, Concord, CA, for the latter to provide all labor, materials, equipment, and supervision to install (1) One Walk in Cooler door with frame 38" X 78" with flat frame, hinges, closer, with window, and (1) One Walk in Freezer door with heated window, four sided frame with heater, hinges and closer, for the Skyline High School Freezer Door Installation Project, described in the proposal dated March 7, 2026, attached to this Agreement as Exhibit A, in the amount of $18,079.90, with the work commencing April 6, 2026, and being completed by June 30, 2026.
Attachments: 1. 26-0672 Construction Agreement Between Owner and Contractor – Apex Refrigeration Corporation – Skyline High School Freezer Door Installation Project – Nutrition Services Department
Contact: preston.thomas@ousd.org
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

title

Ratification by the Board of Education of a Construction Agreement Between Owner and Contractor by and between the District and Apex Refrigeration Corporation, Concord, CA, for the latter to provide all labor, materials, equipment, and supervision to install (1) One Walk in Cooler door with frame 38” X 78” with flat frame, hinges, closer, with window, and  (1) One Walk in Freezer door with heated window, four sided frame with heater, hinges and closer, for the Skyline High School Freezer Door Installation Project, described in the proposal dated March 7, 2026, attached to this Agreement as Exhibit A, in the amount of $18,079.90, with the work commencing April 6, 2026, and being completed by June 30, 2026.