File #:
|
26-0454
Version:
1
|
Name:
|
Agreement Between Owner and Contractor – Next Generation of Builders, LLC – Markham Elementary School Boys Toilet Renovation Project – Buildings and Grounds Department
|
|
Type:
|
Agreement or Contract
|
Status:
|
Passed
|
|
On agenda:
|
3/25/2026
|
Final action:
|
3/25/2026
|
|
Enactment date:
|
3/25/2026
|
Enactment #:
|
26-0483
|
|
Title:
|
Approval by the Board of Education of the Agreement Between Owner and Contractor by and between the District and Next Generation of Builders, LLC, Santa Clara, CA, for the latter to provide renovation of the boys toilet room, which includes supplying equipment, and materials to demolish existing fixtures, partitions, flooring, ceiling, and finishes, along with hazardous material (lead) abatement; deliver new construction including plumbing, mechanical, electrical, ceiling, wall, and floor finishes, ADA-compliant toilet partitions, lavatories, urinals, and related specialty items; and conduct additional work includes painting, carpentry, signage, floor drains, and minor structural modifications, as part of the Markham Elementary School Boys Toilet Renovation Project, in the amount of $238,475.00, which includes a contingency fee of $25,000.00, as the lowest responsive bidder, with the work anticipated to commence on June 1, 2026, and required to be completed within sixty days (60), with...
|
title
Approval by the Board of Education of the Agreement Between Owner and Contractor by and between the District and Next Generation of Builders, LLC, Santa Clara, CA, for the latter to provide renovation of the boys toilet room, which includes supplying equipment, and materials to demolish existing fixtures, partitions, flooring, ceiling, and finishes, along with hazardous material (lead) abatement; deliver new construction including plumbing, mechanical, electrical, ceiling, wall, and floor finishes, ADA-compliant toilet partitions, lavatories, urinals, and related specialty items; and conduct additional work includes painting, carpentry, signage, floor drains, and minor structural modifications, as part of the Markham Elementary School Boys Toilet Renovation Project, in the amount of $238,475.00, which includes a contingency fee of $25,000.00, as the lowest responsive bidder, with the work anticipated to commence on June 1, 2026, and required to be completed within sixty days (60), with an anticipated ending of July 31, 2026.
|