Skip to main content
File #: 26-0346    Version: 1 Name: Construction Agreement Between Owner and Contractor – Tulum Innovative Engineering, Inc. – Manzanita Elementary School Upper Site Improvement Project – Division of Facilities Planning and Management
Type: Agreement or Contract Status: Passed
File created: 2/6/2026 In control: Deputy Chief, Facilities Planning and Management
On agenda: 3/25/2026 Final action: 3/25/2026
Enactment date: 3/25/2026 Enactment #: 26-0474
Title: Approval by the Board of Education of a Construction Agreement Between Owner and Contractor by and between the District and Tulum Innovative Engineering, Inc., Oakland, CA, for the latter to provide construction services which consist of removing, repairing, and relocating an existing electrical christy box, and wiring in the new playground structure; install new low-voltage wiring from the main building to portables; and provide asphalt patch, bore, and trench locations as needed, for the Manzanita Elementary School Upper Site Improvement Project, in the amount of $73,880.00, with work scheduled to commence on March 26, 2026, and scheduled to last until June 30, 2026.
Attachments: 1. 26-0346 Construction Agreement Between Owner and Contractor – Tulum Innovative Engineering, Inc. – Manzanita Elementary School Upper Site Improvement Project – Division of Facilities Planning and Management
Contact: preston.thomas@ousd.org

title

Approval by the Board of Education of a Construction Agreement Between Owner and Contractor by and between the District and Tulum Innovative Engineering, Inc., Oakland, CA, for the latter to provide construction services which consist of removing, repairing, and relocating an existing electrical christy box, and wiring in the new playground structure; install new low-voltage wiring from the main building to portables; and provide asphalt patch, bore, and trench locations as needed, for the Manzanita Elementary School Upper Site Improvement  Project, in the amount of $73,880.00, with work scheduled to commence on March 26, 2026, and scheduled to last until June 30, 2026.