Title: Approval by the Board of Education of Contract for Repairs, Maintenance or Small Construction Project (Contract No. 15100) between District and A&E Emaar, Albany, CA, for the latter to mobilize and finish boarding between 8/22/15 (including weekend work); windows: remove screens on all windows, install 3/4" plywood with 6x18 vents (1 each plywood); roof work: on that areas that was damaged by fire 45' x 55" install 3/4 plywood, adding roofing mastic to close gaps between plywood; install heavy duty tarp on top of the (N) plywood; roof is assumed to be free from debris or equipment; minimal framing to level ceiling joists; power wash the building to remove discoloration, in conjunction with the Claremont Kitchen and Cafeteria Fire Repair Project, more specifically delineated in the Exhibit "A" - Scope of Services, incorporated herein by reference as though fully set forth, to be completed within ten (10) consecutive calendar days from the date specified in the District's Notice To Proce...
Attachments: 1. 15-1770 Contract for Repairs, Maintenance or Small Construction Project - A&E Emaar - Protection of Fire Damaged Cafeteria - Claremont Kitchen and Cafeteria Fire Repair Project
Contact: Lance.Jackson@ousd.org

Title

Approval by the Board of Education of Contract for Repairs, Maintenance or Small Construction Project (Contract No. 15100) between District and A&E Emaar, Albany, CA, for the latter to mobilize and finish boarding between 8/22/15 (including weekend work); windows: remove screens on all windows, install ¾” plywood with 6x18 vents (1 each plywood); roof work: on that areas that was damaged by fire 45’ x 55” install ¾ plywood, adding roofing mastic to close gaps between plywood; install heavy duty tarp on top of the (N) plywood; roof is assumed to be free from debris or equipment; minimal framing to level ceiling joists; power wash the building to remove discoloration, in conjunction with the Claremont Kitchen and Cafeteria Fire Repair Project, more specifically delineated in the Exhibit “A” - Scope of Services, incorporated herein by reference as though fully set forth, to be completed within ten (10) consecutive calendar days from the date specified in the District’s Notice To Proceed (August 13, 2015 and concluding no later than August 23, 2015) in an amount not to exceed $21,500.00.