Legislation Details

File #: 26-1066    Version: 1 Name: Construction Agreement Between Owner and Contractor – Tulum Innovative Engineering – Seqouia Elementary School Kitchen Electrical Project – Nutrition Services Department
Type: Agreement or Contract Status: Passed
File created: 4/27/2026 In control: Deputy Chief, Facilities Planning and Management
On agenda: 5/27/2026 Final action: 5/27/2026
Enactment date: 5/27/2026 Enactment #: 26-0937
Title: Approval by the Board of Education of Construction Agreement Between Owner and Contractor by and between the District and Tulum Innovative Engineering, Oakland, CA, for the latter to provide site survey; mobilization; brainpower to salad bar unit, oven, serving,, run conduit and wire as required; install new breakers as required for voltage required; test wire and label; install the following: 3P/ 15-30 Outlet, and 1 Receptacle - Hot Serving Counter: 240V, 20A, 3P/ 5-30, Outlet, for the Sequoia Elementary School Kitchen Electrical Project. as described in the proposal dated April 16, 2026, attached to this Agreement as Exhibit A, in the amount of $5,280.00, with the work commencing May 28, 2026, and being completed on or before June 30, 2026.
Attachments: 1. 26-1066 Construction Agreement Between Owner and Contractor – Tulum Innovative Engineering – Seqouia Elementary School Kitchen Electrical Project – Nutrition Services Department
Contact: preston.thomas@ousd.org

title

Approval by the Board of Education of Construction Agreement Between Owner and Contractor by and between the District and Tulum Innovative Engineering, Oakland, CA, for the latter to provide site survey; mobilization; brainpower to salad bar unit, oven, serving,, run conduit and wire as required; install new breakers as required for voltage required; test wire and label; install the following: 3P/ 15-30 Outlet, and 1 Receptacle - Hot Serving Counter: 240V, 20A, 3P/ 5-30, Outlet, for the Sequoia Elementary School Kitchen Electrical Project. as described in the proposal dated April 16, 2026, attached to this Agreement as Exhibit A, in the amount of $5,280.00, with the work commencing May 28, 2026, and being completed on or before June 30, 2026.