File #:
|
25-2350
Version:
1
|
Name:
|
Construction Agreement Between Owner and Contractor – D-Line Constructors, Inc. – Montera Middle School Site Improvements Project – Division of Facilities Planning and Management
|
Type:
|
Agreement or Contract
|
Status:
|
Board, General Consent Report
|
On agenda:
|
10/22/2025
|
Final action:
|
|
Enactment date:
|
|
Enactment #:
|
|
Title:
|
Approval by the Board of Education of the Construction Agreement Between Owner and Contractor by and between the District and D-Line Constructors, Inc., Oakland, CA, for the latter to provide "construction services to provide seal coating approximately 43,672.45 square feet of the lower yard area, with crack sealing performed as needed. All existing basketball hoops are to remain in place and must be protected during work. In designated areas, metal poles are to be ground down and included in the seal coating to ensure a smooth, uniform surface. All services are to be completed in a single mobilization to support base preparation for the FIFA field, scheduled to be supplied and installed by FIFA, as further described in the Proposal, which is attached as Exhibit A to this Agreement" for the Montera Middle School Site Improvements Project, in the not to exceed amount of $59,960.00, which includes a contingency fee of $5,360.00, with the work scheduled to commence on October 23, 2025, an...
|
title
Approval by the Board of Education of the Construction Agreement Between Owner and Contractor by and between the District and D-Line Constructors, Inc., Oakland, CA, for the latter to provide “construction services to provide seal coating approximately 43,672.45 square feet of the lower yard area, with crack sealing performed as needed. All existing basketball hoops are to remain in place and must be protected during work. In designated areas, metal poles are to be ground down and included in the seal coating to ensure a smooth, uniform surface. All services are to be completed in a single mobilization to support base preparation for the FIFA field, scheduled to be supplied and installed by FIFA, as further described in the Proposal, which is attached as Exhibit A to this Agreement” for the Montera Middle School Site Improvements Project, in the not to exceed amount of $59,960.00, which includes a contingency fee of $5,360.00, with the work scheduled to commence on October 23, 2025, and scheduled to last until December 23, 2025.
|