File #: 17-0555    Version: 3 Name: Independent Contractor Agreement (Less Than $87,700) – ACC Environmental Consultants – Edna Brewer Middle School Fire Alarm Upgrade Project
Type: Agreement or Contract Status: Passed
File created: 3/17/2017 In control: Senior Business Officer
On agenda: 4/12/2017 Final action: 4/12/2017
Enactment date: 4/12/2017 Enactment #: 17-0430
Title: Approval by the Board of Education of an Independent Contractor Agreement (Less Than $87,700) between the District and ACC Environmental Consultants, Oakland, CA, for the latter to provide asbestos and lead survey for the fire and intrusion alarm system upgrade installation, including a total of 92 bulk samples (80) asbestos, (12) lead will collected and delivered to an independent lab for analysis; provide a report of its findings, which will include a description of the material, sample locations, description of location of material tested, and the level of asbestos and/or lead contained in each sample, in conjunction with the Edna Brewer Middle School Fire Alarm Upgrade Project, more specifically delineated in the Scope of Services in Exhibit "A", incorporated herein by reference as though fully set forth, commencing April 13, 2017, and concluding no later than December 30, 2018, in an amount not-to-exceed $14,170.00.
Attachments: 1. 17-0555 Independent Contractor Agreement (Less Than $87,700) – ACC Environmental Consultants – Edna Brewer Middle School Fire Alarm Upgrade Project
Contact: Joe.Dominguez@ousd.org

title

Approval by the Board of Education of an Independent Contractor Agreement (Less Than $87,700) between the District and ACC Environmental Consultants, Oakland, CA, for the latter to provide asbestos and lead survey for the fire and intrusion alarm system upgrade installation, including a total of 92 bulk samples (80) asbestos, (12) lead will collected and delivered to an independent lab for analysis; provide a report of its findings, which will include a description of the material, sample locations, description of location of material tested, and the level of asbestos and/or lead contained in each sample, in conjunction with the Edna Brewer Middle School Fire Alarm Upgrade Project, more specifically delineated in the Scope of Services in Exhibit “A”, incorporated herein by reference as though fully set forth, commencing April 13, 2017, and concluding no later than December 30, 2018, in an amount not-to-exceed $14,170.00.