Legislation Details

File #: 26-1092    Version: 1 Name: Change Order No. 1, Agreement Between Owner and Contractor – Tulum Innovative Engineering, Inc. – Joaquin Miller Elementary Site Improvements Project - Division of Facilities Planning and Management
Type: Agreement or Contract Status: Passed
File created: 4/30/2026 In control: Deputy Chief, Facilities Planning and Management
On agenda: 5/27/2026 Final action: 5/27/2026
Enactment date: 5/27/2026 Enactment #: 26-0938
Title: Approval by the Board of Education of Change Order No. 1, Agreement Between Owner and Contractor by and between the District and Tulum Innovative Engineering, Inc., Oakland, CA, for the latter to provide additional scope based on OUSD's direction and unforeseen site conditions, including asbestos-contaminated soil excavation and disposal; additional asphalt removal and overtime for seal coating; Tulum overtime and double-time for dry creek installation; additional Protective Industrial Product (PIP) safety surfacing; additional preparation and painting at exterior walls; and additional weeks of air monitoring for KABOOM, and premium time due to late start, as identified in Potential Change Order (PCO's) Nos. 2 thru 4 and Nos. 6 thru 9, for the Joaquin Miller Elementary Site Improvements Project, in the not-to-exceed amount of $203,565.90, increasing the Agreement not to exceed amount from $598,634.00 to $802,199.90. All other terms and conditions of the Agreement remain in full force ...
Attachments: 1. 26-1092 Change Order No. 1, Agreement Between Owner and Contractor – Tulum Innovative Engineering, Inc. – Joaquin Miller Elementary Site Improvements Project - Division of Facilities Planning and Management
Related files: 25-1290
Contact: preston.thomas@ousd.org

title

Approval by the Board of Education of Change Order No. 1, Agreement Between Owner and Contractor by and between the District and Tulum Innovative Engineering, Inc., Oakland, CA, for the latter to provide additional scope based on OUSD’s direction and unforeseen site conditions, including asbestos-contaminated soil excavation and disposal; additional asphalt removal and overtime for seal coating; Tulum overtime and double-time for dry creek installation; additional Protective Industrial Product (PIP) safety surfacing; additional preparation and painting at exterior walls; and additional weeks of air monitoring for KABOOM, and premium time due to late start, as identified in Potential Change Order (PCO’s) Nos. 2 thru 4 and Nos. 6 thru 9, for the Joaquin Miller Elementary Site Improvements Project, in the not-to-exceed amount of $203,565.90, increasing the Agreement not to exceed amount from $598,634.00 to $802,199.90.  All other terms and conditions of the Agreement remain in full force and effect.