File #: 25-2338    Version: 1 Name: Construction Agreement Between Owner and Contractor – DecoTech Systems, Inc. – Lockwood Network Infrastructure Project – Division of Facilities Planning and Management
Type: Agreement or Contract Status: Board, General Consent Report
File created: 9/17/2025 In control: Deputy Chief, Facilities Planning and Management
On agenda: 10/22/2025 Final action:
Enactment date: Enactment #:
Title: Approval by the Board of Education of a Construction Agreement Between Owner and Contractor by and between the District and DecoTech Systems, Inc., Walnut Creek, CA, for the latter to install fiber optic cabling and integrate the network system of Lockwood STEAM Academy Main Distribution Frame and College Coliseum Preparatory Academy Main Distribution Frame for the Lockwood Network Infrastructure Project, as delineated in Exhibit A of the Agreement, in the not to exceed amount of $44,925.51, with the work scheduled to commence on October 23, 2025, and scheduled to last until December 30, 2025.
Attachments: 1. 25-2338 Construction Agreement Between Owner and Contractor – DecoTech Systems, Inc. – Lockwood Network Infrastructure Project – Division of Facilities Planning and Management
Contact: preston.thomas@ousd.org
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

title

Approval by the Board of Education of a Construction Agreement Between Owner and Contractor by and between the District and DecoTech Systems, Inc., Walnut Creek, CA, for the latter to install fiber optic cabling and integrate the network system of Lockwood STEAM Academy Main Distribution Frame and College Coliseum Preparatory Academy Main Distribution Frame for the Lockwood Network Infrastructure Project, as delineated in Exhibit A of the Agreement, in the not to exceed amount of $44,925.51, with the work scheduled to commence on October 23, 2025, and scheduled to last until December 30, 2025.