File #:
|
25-0368
Version:
1
|
Name:
|
Agreement Between Owner and Contractor - Redgwick Co. - Madison Primary School Site Improvements Project - Division of Facilities Planning and Management
|
Type:
|
Agreement or Contract
|
Status:
|
Board, General Consent Report
|
On agenda:
|
3/12/2025
|
Final action:
|
|
Enactment date:
|
|
Enactment #:
|
|
Title:
|
Approval by the Board of Education of an Award of Bid to, rejection of all other bids, if any, and an Agreement Between Owner and Contractor by and between the District and Redgwick Construction Co., Oakland, CA, for the latter, as the lowest responsible and responsive bidder, to demolish existing play structures, safety surfacing, basketball hoop poles, and chain-link fencing, and enhance the garden with new planter boxes, mulch, and an upgraded drip irrigation system; install Safety surfacing tiles and drainage systems; perform additional work including installing privacy screens, preparing walls for murals, tree planting with irrigation and drainage, and upgrades to the nature area with a decomposed granite pathway, and pavement replacement and turf field upgrades, for the Madison Primary School Site Improvements Project, in the amount of $1,347,100.00, which includes a contingency allowance of $180,000.00, with the work anticipated to commence on March 13, 2025, and required to be ...
|
title
Approval by the Board of Education of an Award of Bid to, rejection of all other bids, if any, and an Agreement Between Owner and Contractor by and between the District and Redgwick Construction Co., Oakland, CA, for the latter, as the lowest responsible and responsive bidder, to demolish existing play structures, safety surfacing, basketball hoop poles, and chain-link fencing, and enhance the garden with new planter boxes, mulch, and an upgraded drip irrigation system; install Safety surfacing tiles and drainage systems; perform additional work including installing privacy screens, preparing walls for murals, tree planting with irrigation and drainage, and upgrades to the nature area with a decomposed granite pathway, and pavement replacement and turf field upgrades, for the Madison Primary School Site Improvements Project, in the amount of $1,347,100.00, which includes a contingency allowance of $180,000.00, with the work anticipated to commence on March 13, 2025, and required to be completed within fifty-eight (58) days, with an anticipated ending of May 9, 2025.
|