File #:
|
25-1290
Version:
1
|
Name:
|
Agreement Between Owner and Contractor – Tulum Innovative Engineering, Inc. – Joaquin Miller Elementary Site Improvements Project- Division of Facilities Planning and Management
|
Type:
|
Agreement or Contract
|
Status:
|
Passed
|
On agenda:
|
6/11/2025
|
Final action:
|
6/11/2025
|
Enactment date:
|
6/11/2025
|
Enactment #:
|
25-1005
|
Title:
|
Approval by the Board of Education of an Agreement Between Owner and Contractor by and between the District and Tulum Innovative Engineering, Inc., Oakland, CA, for the latter to demolish existing play structures, safety surfacing, basketball hoop post, enhance the garden space, and prepare surface to receive new nature area; install safety systems for new play structures (to be installed by others); perform additional work including installing privacy screens, prepare walls for mirrors, tree planning with irrigation and drainage, and upgrades to the nature area with a decomposed granite pathway, for the Joaquin Miller Elementary School Site Improvements Project, in the amount of $598,634.00, which includes a contingency of $63,000.00, as the lowest responsive, responsible bidder, with the work anticipated to commence on June 12, 2025, and required to be completed within seventy-nine (79) days, with an anticipated ending of August 30, 2025.
|
title
Approval by the Board of Education of an Agreement Between Owner and Contractor by and between the District and Tulum Innovative Engineering, Inc., Oakland, CA, for the latter to demolish existing play structures, safety surfacing, basketball hoop post, enhance the garden space, and prepare surface to receive new nature area; install safety systems for new play structures (to be installed by others); perform additional work including installing privacy screens, prepare walls for mirrors, tree planning with irrigation and drainage, and upgrades to the nature area with a decomposed granite pathway, for the Joaquin Miller Elementary School Site Improvements Project, in the amount of $598,634.00, which includes a contingency of $63,000.00, as the lowest responsive, responsible bidder, with the work anticipated to commence on June 12, 2025, and required to be completed within seventy-nine (79) days, with an anticipated ending of August 30, 2025.
|