Skip to main content
File #: 25-1437    Version: 1 Name: Agreement Between Owner and Contractor – Moka Engineering Construction, Inc. – Martin Luther King Jr. Elementary School Site Improvement Project – Division of Facilities Planning and Management
Type: Agreement or Contract Status: Board, General Consent Report
File created: 5/20/2025 In control: Deputy Chief, Facilities Planning and Management
On agenda: 6/25/2025 Final action:
Enactment date: Enactment #:
Title: Approval by the Board of Education of Agreement Between Owner and Contractor by and between the District and Moka Engineering Construction, Inc. Santa Clara, CA, for the latter to provide demolition and site improvement services includes installing and replacing existing play structures, safety surfacing, basketball hoop poles, and chain-link fencing, upgrading the irrigation system and repaving decomposed granite and turf tiles, and other services, as described in the Bid Form Document 00 31 01, incorporated herein by reference as though fully set forth, for the Martin Luther King Jr. Elementary School Site Improvement Project, in the amount of $576,500.00, which includes a contingency allowance of $53,000.00, as the lowest responsive, responsible bidder, with the work anticipated to commence on July 7, 2025, and required to be completed within sixty days (60), with an anticipated ending of September 5, 2025.
Attachments: 1. 25-1437 Agreement Between Owner and Contractor – Moka Engineering Construction, Inc. – Martin Luther King Jr. Elementary School Site Improvement Project – Division of Facilities Planning and Management
Contact: preston.thomas@ousd.org
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

title

Approval by the Board of Education of Agreement Between Owner and Contractor by and between the District and Moka Engineering Construction, Inc. Santa Clara, CA, for the latter to provide demolition and site improvement services includes installing and replacing existing play structures, safety surfacing, basketball hoop poles, and chain-link fencing, upgrading the irrigation system and repaving decomposed granite and turf tiles, and other services, as described in the Bid Form Document 00 31 01, incorporated herein by reference as though fully set forth, for the Martin Luther King Jr. Elementary School Site Improvement Project, in the amount of $576,500.00, which includes a contingency allowance of $53,000.00, as the lowest responsive, responsible  bidder, with the work anticipated to commence on July 7, 2025, and required to be completed within sixty days (60), with an anticipated ending of September 5, 2025.