|
Legislation Details
|
File #:
|
26-1666
Version:
1
|
Name:
|
Agreement Between Owner and Contractor – Redgwick Construction Company – Sequoia Elementary School Site Improvements Project - Division of Facilities Planning and Management
|
|
Type:
|
Agreement or Contract
|
Status:
|
Board, General Consent Report
|
|
On agenda:
|
8/26/2026
|
Final action:
|
|
|
Enactment date:
|
|
Enactment #:
|
|
|
Title:
|
Approval by the Board of Education of a Bid Award, rejecting all other bids, and of an Agreement Between Owner and Contractor by and between the District and Redgwick Construction Company, Oakland, CA, for the latter to provide all necessary site preparation activities, including but not limited to removal of existing play structures, basketball hoops, planers, and selected asphalt areas; create new nature and garden spaces through soil excavation and the installation of irrigation and drainage systems; preparation for new play structures, including perimeter curbing and playground surfacing; additional site enhancements consisting of new tree planting with supporting irrigation systems, seal coating of existing pavement, and seal coating over new murals; more specifically described in specifications for the Sequoia Elementary School Site Improvements Project, in the amount of $816,100.00, which includes a contingency of $82,400.00, as the lowest responsible, responsive bidder, with t...
|
title
Approval by the Board of Education of a Bid Award, rejecting all other bids, and of an Agreement Between Owner and Contractor by and between the District and Redgwick Construction Company, Oakland, CA, for the latter to provide all necessary site preparation activities, including but not limited to removal of existing play structures, basketball hoops, planers, and selected asphalt areas; create new nature and garden spaces through soil excavation and the installation of irrigation and drainage systems; preparation for new play structures, including perimeter curbing and playground surfacing; additional site enhancements consisting of new tree planting with supporting irrigation systems, seal coating of existing pavement, and seal coating over new murals; more specifically described in specifications for the Sequoia Elementary School Site Improvements Project, in the amount of $816,100.00, which includes a contingency of $82,400.00, as the lowest responsible, responsive bidder, with the work anticipated to commence on August 27, 2026, and required to be completed within sixty (60) days, with an anticipated ending of October 30, 2026.
|