|
|
File #:
|
25-2675
Version:
1
|
Name:
|
Agreement Between Owner and Contractor – N G Builder Company – Highland Child Development Center Play Yard Site Improvement Project – Division of Facilities Planning and Management
|
|
Type:
|
Agreement or Contract
|
Status:
|
Passed
|
|
On agenda:
|
12/10/2025
|
Final action:
|
12/10/2025
|
|
Enactment date:
|
12/10/2025
|
Enactment #:
|
25-1975
|
|
Title:
|
Approval by the Board of Education of the Agreement Between Owner and Contractor by and between the District and N G Builder Company, Santa Clara, CA, for the latter to demolish and dispose of the existing play structure, safety surfacing, and asphalt layer within the designated play area; installing new play structure, PIP (Poured-in-Place) safety surfacing, and a new drainage system to serve the play area, apply double layer of seal coating; furnishing and installing new trees with complete irrigation and drainage systems, as well as preparing the nature space and installing nature play elements such as logs, stumps, and similar features, more specifically as described in Exhibit A and other contract documents as part of the Highland Child Development Center Play Yard Site Improvement Project, in the amount of $279,333.00, which includes a contingency fee of $37,000.00, as the lowest responsive bidder, rejecting all other bids, with the work anticipated to commence on December 11, 20...
|
title
Approval by the Board of Education of the Agreement Between Owner and Contractor by and between the District and N G Builder Company, Santa Clara, CA, for the latter to demolish and dispose of the existing play structure, safety surfacing, and asphalt layer within the designated play area; installing new play structure, PIP (Poured-in-Place) safety surfacing, and a new drainage system to serve the play area, apply double layer of seal coating; furnishing and installing new trees with complete irrigation and drainage systems, as well as preparing the nature space and installing nature play elements such as logs, stumps, and similar features, more specifically as described in Exhibit A and other contract documents as part of the Highland Child Development Center Play Yard Site Improvement Project, in the amount of $279,333.00, which includes a contingency fee of $37,000.00, as the lowest responsive bidder, rejecting all other bids, with the work anticipated to commence on December 11, 2025, and required to be completed within seventy-five days (75), with an anticipated ending of February 25, 2026.
|