File #: 16-1514    Version: 1 Name: Award of Bid - Construction Contract – Ray’s Electric – Madison Park Academy Upper Campus Prop 39 Lighting Upgrade Project
Type: Resolution Status: Passed
File created: 6/8/2016 In control: Operations
On agenda: 6/22/2016 Final action: 6/22/2016
Enactment date: 6/22/2016 Enactment #: 16-1029
Title: Adoption by the Board of Education of Resolution No. 1516-0249,- Award of Bid and Construction Contract between the District and Ray's Electric, Oakland, CA for the latter to provide optimize DDC control sequence to optimize start of sequence of boilers and package units, delamp existing lights in existing portables 1,2 and 3, remove existing exterior lights and replace with new LED bi-level lighting, in conjunction with the Madison Park Academy Upper Campus Prop 39 Lighting Upgrade Project, commencing June 22, 2016 and concluding no later than December 1, 2016, in the amount of $175,000.00, as the lowest responsive, responsible bidder. The work will be conducted in one (1) phase, contract duration of (53) calendar days.
Attachments: 1. 16-1514 Award of Bid - Construction Contract – Ray’s Electric – Madison Park Academy Upper Campus Prop 39 Lighting Upgrade Project
Contact: Joe.Dominguez@ousd.org

Title

Adoption by the Board of Education of Resolution No. 1516-0249,- Award of Bid and Construction Contract between the District and Ray’s Electric, Oakland, CA for the latter to provide optimize DDC control sequence to optimize start of sequence of boilers and package units, delamp existing lights in existing portables 1,2 and 3, remove existing exterior lights and replace with new LED bi-level lighting, in conjunction with the Madison Park Academy Upper Campus Prop 39 Lighting Upgrade Project, commencing June 22, 2016 and concluding no later than December 1, 2016, in the amount of $175,000.00, as the lowest responsive, responsible bidder. The work will be conducted in one (1) phase, contract duration of (53) calendar days.