Skip to main content
File #: 25-1674    Version: 1 Name: Agreement Between Owner and Contractor – Native Soil Inc. – Manzanita Elementary School Upper Yard Site Improvement Project – Division of Facilities Planning and Management
Type: Agreement or Contract Status: Board, General Consent Report
File created: 6/11/2025 In control: Deputy Chief, Facilities Planning and Management
On agenda: 8/13/2025 Final action:
Enactment date: Enactment #:
Title: Approval by the Board of Education of Agreement Between Owner and Contractor by and between the District and Native Soil Inc., Oakland, CA, for the latter to demolish existing play structures, safety surfacing, basketball hoop poles, and remove existing planter boxes, mulch, and retaining wall adjacent to play structures; install safety surfacing tiles and drainage systems; (New play structure to be installed by others.); perform additional work including preparing walls for murals, tree planting with irrigation and drainage, upgrade to the nature area, and pavement replacement; and as further described in the Bid Form Document 00 31 01, incorporated herein by reference as though fully set forth, for the Manzanita Elementary School Upper Yard Site Improvement Project, in the amount of $430,815.00, which includes a contingency allowance of $53,000.00, as the lowest responsible bidder, rejecting all other bids, if any, with the work anticipated to commence on August 25, 2025, and require...
Attachments: 1. 25-1674 Agreement Between Owner and Contractor – Native Soil Inc. – Manzanita Elementary School Upper Yard Site Improvement Project – Division of Facilities Planning and Management
Contact: preston.thomas@ousd.org
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

title

Approval by the Board of Education of Agreement Between Owner and Contractor by and between the District and Native Soil Inc., Oakland, CA, for the latter to demolish existing play structures, safety surfacing, basketball hoop poles, and remove existing planter boxes, mulch, and retaining wall adjacent to play structures; install safety surfacing tiles and drainage systems; (New play structure to be installed by others.); perform additional work including preparing walls for murals, tree planting with irrigation and drainage, upgrade to the nature area, and pavement replacement; and as further described in the Bid Form Document 00 31 01, incorporated herein by reference as though fully set forth, for the Manzanita Elementary School Upper Yard Site Improvement Project, in the amount of $430,815.00, which includes a contingency allowance of $53,000.00, as the lowest responsible bidder, rejecting all other bids, if any, with the work anticipated to commence on August 25, 2025, and required to be completed within sixty (60) days, with an anticipated ending of October 24, 2025.