Legislation Details

File #: 26-1716    Version: 1 Name: Change Order No. 1, Agreement Between Owner and Contractor – Next Generation of Builders, LLC – Markham Elementary School Boys Toilet Renovation Project – Buildings and Grounds Department
Type: Agreement or Contract Status: Board, General Consent Report
File created: 8/5/2026 In control: Deputy Chief, Facilities Planning and Management
On agenda: 9/9/2026 Final action:
Enactment date: Enactment #:
Title: Approval by the Board of Education of Change Order No. 1, Agreement Between Owner and Contractor by and between the District and Next Generation of Builders, LLC, Santa Clara, CA, resulting “in a net addition of $11,796.39 to the contract amount after applying $1,040.09 in available pending allowance funds towards PCO#4, based on the following adjustments totaling $12,836.48: PC0#4 Concrete Demolition and Replacement (+$7,308.88): Unforeseen conditions requiring demolition of existing concrete slab in front of the urinals. placement of new reinforced concrete, and restoration of the-affected area for subsequent flooring installation. PCO#5 Toilet Flange Repair (+$1,321.66): Added for replacement of a damaged and deteriorated existing toilet flange discovered during restroom demolition. Work includes removal of unsuitable flange components and installation of a new commercial-grade flange, to allow proper installation of the new toilet fixture. PC0#6 ASI 03 - Ceiling Conduit Support (+$...
Attachments: 1. 26-1716 Change Order No. 1, Agreement Between Owner and Contractor – Next Generation of Builders, LLC – Markham Elementary School Boys Toilet Renovation Project – Buildings and Grounds Department
Related files: 26-0454
Contact: Preston.Thomas@ousd.org
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

title
Approval by the Board of Education of Change Order No. 1, Agreement Between Owner and Contractor by and between the District and Next Generation of Builders, LLC, Santa Clara, CA, resulting “in a net addition of $11,796.39 to the contract amount after applying $1,040.09 in available pending allowance funds towards PCO#4, based on the following adjustments totaling $12,836.48:

1.                     PC0#4 Concrete Demolition and Replacement (+$7,308.88): Unforeseen conditions requiring demolition of existing concrete slab in front of the urinals. placement of new reinforced concrete, and restoration of the-affected area for subsequent flooring installation.

2.                     PCO#5 Toilet Flange Repair (+$1,321.66): Added for replacement of a damaged and deteriorated existing toilet flange discovered during restroom demolition. Work includes removal of unsuitable flange components and installation of a new commercial-grade flange, to allow proper installation of the new toilet fixture.

3.                     PC0#6 ASI 03 - Ceiling Conduit Support (+$2,380.82): Added for installation of additional conduit supports per ASI 03, including 3/4" J-hangers, threaded rods. anchors, and related electrical support work required for new conduits above the restroom ceiling based on the City Electric Service layout.

4.                     PC0#7 Bathroom Lighting Fixture Upgrade (+$1,825.12): Added for the cost difference between the originally proposed Lithonia F1/F1A bathroom light fixtures and the architect-requested Prudential BOLT PRO LED fixtures.

for the latter to provide foretasted additional work, as part of the Markham Elementary School Boys Toilet Renovation Project, in the not-to-exceed net amount of $11,796.39, increasing the contract price from $238,475.00 to $250,271.39 and extending the Agreement term from June 1, 2026, through July 31, 2026, to August 21, 2026, an extension of twenty-three (23) calendar days. All other terms and conditions of the Agreement remain unchanged and in full force and effect.