Title
Adoption by Board of Education of Repair Contract with MC Construction Services, Inc., Livermore, CA, for the latter to prepare, repair and finish existing retaining wall as required by engineers drawings and specifications and with additional options as chosen in consultation with Engineer in conjunction with the Horace Mann Elementary School Retaining Wall Project for the period commencing May 1, 2008 and terminating on June 30, 2008 in an amount not to exceed $39,778.00.
Body
[Enter body here.]