T.-1
Construction, Inc. – Havenscourt/Lockwood STEAM Academy
Campus Window Replacement Building M Project – Buildings and
Grounds Department
Approval by the Board of Education of Agreement Between Owner and
Contractor by and between the District and Pinguelo Construction, Inc.,
Fairfield, CA, for the latter to provide construction services which consist of
Demolish existing windows, patching, and painting of openings inside and out
as needed. F&I [Furnish and Install] new three sectional windows, top
section stationary, two lower sections operable, awning type, with four- inch
opening restrictors (1st floor only), dual pane low E rating tinted glass,
window guards, rest room panes to be obscure, dark bronze finish frames.
Shop drawings are required for approval. Havenscourt Middle School
Campus Building M (Coliseum Academy Prep) - 95 windows -
approximately 3' x7' high, bidders to verify. Lockwood Campus Building E -
48 windows - approximately 3' x7' high, bidders to verify. The Lockwood
Kindergarten Building B - 91 windows of different sizes -This building has a
variation of different type and size windows on all nine sides of the building.
The classroom windows will have awning type with four-inch opening
restrictors in the middle of the frame and fixed windows top and bottom, for
the Havenscourt Middle School Campus Building M (Coliseum Academy
Prep) and Lockwood Building E to match existing windows on the
Havenscourt Middle School Campus Building M (Coliseum Academy Prep)
66th Avenue Street elevation, for the Havenscourt Middle School
Building M (Coliseum College Prep) and Lockwood STEAM
Academy Window Replacement Project, in the lump sum amount of
$3,045,000.00, which includes contingency allowances totaling
$60,000.00, as the lowest responsive, responsible bidder, with the work
anticipated to commence on January 26, 2023, and scheduled to last for
three hundred sixty-five days (365), with an anticipated ending of January
25, 2024.
Vendor No.: 008194
Requisition No.: VR23-05452
Resource Code-Site No.: 9914-232
Funding Source: Fund 140 Deferred Maintenance
Attachments:
A motion was made by Vice President Thompson, seconded by
Director Davis, to Approve the General Consent Report. The motion
carried by the following vote:
Ayes:
6 - Benjamin "Sam" Davis
Jennifer Brouhard
Nick Resnick
Valarie Bachelor
Clifford Thompson
Mike Hutchinson