U. Adoption of the General Consent Report - General Obligation Bonds
Measures B, J and Y
All items appearing on the agenda under "Adoption of the General Consent
Report(s)" means that all items appearing on the agenda under this topic are
approved in one motion per consent report unless a Board member requests
that an item be removed and voted on separately or otherwise acted upon.
Items so removed from a General Consent Report shall be considered
separately in the agenda immediately after that General Consent Report
(unless otherwise moved with other items by a Board member) and there
shall be no additional or separate public comment on those items. Generally,
these items are routine in nature, and are acted upon in one motion to
conserve time and permit focus on other than routine items on the agenda.
An
item on a General Consent Report which a member has requested be
removed, shall be removed, without debate for separate consideration and
vote or other disposition. All items remaining on the General Consent
Report(s), thereafter, shall be adopted in a single motion per consent report.
U.-1
Electric Company - East Oakland Pride Elementary School
Electrical Vehicle Charger Installation Project – Division of
Facilities Planning and Management
Ratification by the Board of Education of PG&E Charge Schools and
Parks Program Contract by and between the District and Pacific Gas and
Electric Company (“PG&E”) stating terms and conditions for District’s
participation in the latter’s Electric Vehicle (EV) Charge Schools and
Parks Program, as described in the California Public Utilities Commission
or “CPUC”, Decision Number 19-11-017 issued November 13, 2019,
and as administered by PG&E, subject to satisfaction of the site specific
contingencies’ described in Contract, for location of a 3 ChargePoint CT
4000 (Dual Port) at 8000 Birch Street, Oakland, CA (District’s
Property), for an eight (8) year period from the date that the Electric
Vehicle Service Equipment (EVSE) becomes operational, with the District
paying a currently estimated cost of $98,304.00 (approximately
$1,024/month) and receiving a rebate of approximately $39,315.00 over
the term of the Contract, respectively.
Resource Code-Site No.: 9655 107
Funding Source: Fund 21 Building Funds Measure Y
Attachments:
A motion was made by Director Bachelor, seconded by Director Davis,
to Approve the General Consent Report - General Obligation Bonds
Measures B, J and Y. The motion carried by the following vote: