File #: 23-1099    Version: 1 Name: Agreement Between Owner and Contractor – KM 106 Construction, Inc. – Carl Munck Elementary School Asphalt Removal and Replacement Project – Buildings and Grounds Department
Type: Agreement or Contract Status: Passed
File created: 4/18/2023 In control: Deputy Chief, Facilities Planning and Management
On agenda: 5/24/2023 Final action: 5/24/2023
Enactment date: 5/24/2023 Enactment #: 23-0878
Title: Approval by the Board of Education of an Agreement Between Owner and Contractor by and between the District and KM 106 Construction, Inc., San Francisco, CA, for the latter to provide cut, demolish, and excavate approximately 91,340 SF of failed pavement to depth of 3" and transport spoils to recycling center. Compact existing base rock, then sweeting it up with one inch of class II base rock, apply tack oil along perimeter edges, then provide, place and compact 2.5" of1/2" medium hot-mix asphalt. AC Overlay with Fabric: Alternate in Lieu of R/R Grind/chip perimeter edges of overlay as required for flush transitions, clean pavement surface, fill crack with hot crack filler then apply tack oil, install pavement reinforcement fabric and place and compact 1.5" of1/2" medium hot-mix asphalt on approximately 91,340 SF. After punch list is complete all warranties must be submitted, for the Carl Munck Elementary School Asphalt Removal and Replacement Project, in the lump sum amount of $395...
Attachments: 1. 23-1099 Agreement Between Owner and Contractor – KM 106 Construction, Inc. – Carl Munck Elementary School Asphalt Removal and Replacement Project – Buildings and Grounds Department
Contact: Kenya.Chatman@ousd.org

Title

Approval by the Board of Education of an Agreement Between Owner and Contractor by and between the District and KM 106 Construction, Inc., San Francisco, CA, for the latter to provide cut, demolish, and excavate approximately 91,340 SF of failed pavement to depth of 3" and transport spoils to recycling center.  Compact existing base rock, then sweeting it up with one inch of class II base rock, apply tack oil along perimeter edges, then provide, place and compact 2.5" of½" medium hot-mix asphalt.  AC Overlay with Fabric:  Alternate in Lieu of R/R Grind/chip perimeter edges of overlay as required for flush transitions, clean pavement surface, fill crack with hot crack filler then apply tack oil, install pavement reinforcement fabric and place and compact 1.5" of½" medium hot-mix asphalt on approximately 91,340 SF. After punch list is complete all warranties must be submitted, for the Carl Munck Elementary School Asphalt Removal and Replacement Project, in the lump sum amount of $395,899.00, which includes a contingency allowance of $45,000.00, as the lowest responsive, responsible bidder, with the work anticipated to commence on May 25, 2023, and to be completed within sixty days (60), with an anticipated ending of July 23, 2023.