File #:
|
18-1505
Version:
1
|
Name:
|
Amendment No. 1, Architectural Services Contract - Perkins Eastman Architects DPC - Piedmont Elementary School Finishing Kitchen & Cafeteria
|
Type:
|
Agreement or Contract
|
Status:
|
Passed
|
On agenda:
|
6/27/2018
|
Final action:
|
6/27/2018
|
Enactment date:
|
6/27/2018
|
Enactment #:
|
18-1069
|
Title:
|
Approval by the Board of Education of Amendment No. 1, Agreement for Architectural Services between the District and Perkins Eastman Architects DPC*, Oakland, CA, for the latter to provide extra structural design and engineering for drilled concrete pier foundation system; energy and lighting computer modeling and design City of Oakland C.3 storm water pollution control measures; pre-fab building design drawings, in conjunction with the Piedmont Finishing Kitchen & Cafeteria Project, in the additional amount of $43,415.00, increasing the not to exceed amount of Agreement from $363,000.00 to $406,415.00 and extending Agreement of March 23, 2016 through December 31, 2018 to December 30, 2021.
_______
*Dougherty and Dougherty Architects, Inc., effective May 2, 2018, became Perkins Eastman Architects, DPC.
|
title Approval by the Board of Education of Amendment No. 1, Agreement for Architectural Services between the District and Perkins Eastman Architects DPC*, Oakland, CA, for the latter to provide extra structural design and engineering for drilled concrete pier foundation system; energy and lighting computer modeling and design City of Oakland C.3 storm water pollution control measures; pre-fab building design drawings, in conjunction with the Piedmont Finishing Kitchen & Cafeteria Project, in the additional amount of $43,415.00, increasing the not to exceed amount of Agreement from $363,000.00 to $406,415.00 and extending Agreement of March 23, 2016 through December 31, 2018 to December 30, 2021. _______
*Dougherty and Dougherty Architects, Inc., effective May 2, 2018, became Perkins Eastman Architects, DPC.
|