File #: 16-1795    Version: 1 Name: Independent Consultant Agreement for Professional Services – Integral Group, Inc. – Fremont High School New Construction Project
Type: Agreement or Contract Status: Passed
File created: 8/4/2016 In control: Senior Business Officer
On agenda: 8/24/2016 Final action: 8/24/2016
Enactment date: 8/24/2016 Enactment #: 16-1400
Title: Approval by the Board of Education of an Independent Consultant Agreement between the District and Integral Group, Inc., Oakland, CA, for the latter to provide commissioning services including: heating, ventilation, air conditioning (HVAC) systems and controls(CHPS/T24 required), lighting systems and controls, domestic hot water systems, pumping systems (sewage/sump booster), landscape irrigation systems, water re-use systems, on-site renewable energy systems; review of Owner's or Owner representative's Project Requirements(OPR), Review of Basis of Design (BOD), Full commissioned systems peer design review; commissioning plan, submittal review; pre-functional test/checklists, in conjunction with the Fremont High School New Construction Project more specifically delineated in the Scope of Services in Exhibit "A", incorporated herein by reference as though fully set forth, commencing August 25, 2016 and concluding no later than December 30, 2020, in an amount not to exceed $264,700.00.
Attachments: 1. 16-1795 Independent Consultant Agreement for Professional Services – Integral Group, Inc. – Fremont High School New Construction Project
Related files: 19-0385, 21-1456, 21-2747, 20-1956, 21-3020, 21-0432
Contact: Joe.Dominguez@ousd.org

Title

Approval by the Board of Education of an Independent Consultant Agreement  between the District and  Integral Group, Inc., Oakland, CA, for the latter to provide commissioning services including: heating, ventilation, air conditioning (HVAC) systems and controls(CHPS/T24 required), lighting systems and controls, domestic hot water systems, pumping systems (sewage/sump booster), landscape irrigation systems, water re-use systems, on-site renewable energy systems; review of Owner’s or Owner representative’s Project Requirements(OPR), Review of Basis of Design (BOD), Full commissioned systems peer design review; commissioning plan, submittal review; pre-functional test/checklists, in conjunction with the Fremont High School New Construction Project more specifically delineated in the Scope of Services in Exhibit “A”, incorporated herein by reference as though fully set forth, commencing August 25, 2016 and concluding no later than December 30, 2020, in an amount not to exceed $264,700.00.