File #: 16-1755    Version: 1 Name: Equipment, Materials and Supplies Contract - On Time Marketing - Glenview Elementary School New Construction Contract
Type: Agreement or Contract Status: Passed
File created: 7/29/2016 In control: Senior Business Officer
On agenda: 8/24/2016 Final action: 8/24/2016
Enactment date: 8/24/2016 Enactment #: 16-1394
Title: Ratification by the Board of Education of an Equipment, Materials and Supplies Contract between the District and On Time Marketing, Fairfield, CA, for the latter to provide new CAT6 patch cords in MDF and all IDFs, provide a new IDF in each of the Adult Annex and CDC Annex buildings which includes: Data rack, patch panels, patch cords, power strips and UPS, provide a new 24-port Cisco ME-3600X switch in the MDF, provide new CAT6 data outlets and CAT5 telephone (analog) outlets in the CDC and Adult Annexes, provide 12-strand single mode fiber optic cable between the following locations: MDF to CDC IDF, MDF to Adult Annex IDF, CDC IDF to CDC MPOE, Adult Annex IDF to Adult Annex MPOE, provide Fiber Optic patch panel in the MDF and new IDFs, provide Speaker trunk cable from MDF to the CDC IDF and Adult Annex IDF, and an one year warranty, in conjunction with the Glenview Elementary School New Construction Project, more specifically delineated in the Scope of Services in Exhibit "A", incorp...
Attachments: 1. 16-1755 Equipment, Materials and Supplies Contract - On Time Marketing - Glenview Elementary School New Construction Contract
Contact: Joe.Dominguez@ousd.org

Title

Ratification by the Board of Education of an Equipment, Materials and Supplies Contract between the District and On Time Marketing, Fairfield, CA, for the latter to provide new CAT6 patch cords in MDF and all IDFs, provide a new IDF in each of the Adult Annex and CDC Annex buildings which includes: Data rack, patch panels, patch cords, power strips and UPS, provide a new 24-port Cisco ME-3600X switch in the MDF, provide new CAT6 data outlets and CAT5 telephone (analog) outlets in the CDC and Adult Annexes, provide 12-strand single mode fiber optic cable between the following locations: MDF to CDC IDF, MDF to Adult Annex IDF, CDC IDF to CDC MPOE, Adult Annex IDF to Adult Annex MPOE, provide Fiber Optic patch panel in the MDF and new IDFs, provide Speaker trunk cable from MDF to the CDC IDF and Adult Annex IDF, and an one year warranty, in conjunction with the Glenview Elementary School New Construction Project, more specifically delineated in the Scope of Services in Exhibit “A”, incorporated herein by reference as though fully set forth, commencing August 10, 2016 and concluding no later than September 30, 2016, in an amount not to exceed $75,000.00.