<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Oakland Unified School District - File #: 16-1795</title><link>https://ousd.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=2811221&amp;GUID=D5D1AD94-4469-409B-A378-7489534AAB63</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://ousd.legistar.com/Feed.ashx?M=LD&amp;ID=2811221&amp;GUID=D5D1AD94-4469-409B-A378-7489534AAB63" rel="self" type="application/atom+xml" /><item><title>Oakland Unified School District - File #: 16-1795</title><link>https://ousd.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=2811221&amp;GUID=D5D1AD94-4469-409B-A378-7489534AAB63</link><guid isPermaLink="false">D5D1AD94-4469-409B-A378-7489534AAB63-2025-08-20-02-31-17</guid><description>Title: Approval by the Board of Education of an Independent Consultant Agreement  between the District and  Integral Group, Inc., Oakland, CA, for the latter to provide commissioning services including: heating, ventilation, air conditioning (HVAC) systems and controls(CHPS/T24 required), lighting systems and controls, domestic hot water systems, pumping systems (sewage/sump booster), landscape irrigation systems, water re-use systems, on-site renewable energy systems; review of Owner’s or Owner representative’s Project Requirements(OPR), Review of Basis of Design (BOD), Full commissioned systems peer design review; commissioning plan, submittal review; pre-functional test/checklists, in conjunction with the Fremont High School New Construction Project more specifically delineated in the Scope of Services in Exhibit “A”, incorporated herein by reference as though fully set forth, commencing August 25, 2016 and concluding no later than December 30, 2020, in an amount not to exceed $264,700.00.</description><pubDate>Wed, 20 Aug 2025 02:31:17 GMT</pubDate></item></channel></rss>