<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Oakland Unified School District - File #: 26-1092</title><link>https://ousd.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=8028659&amp;GUID=67298C3B-AD29-45AE-AFD5-E0F8CF96B391</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://ousd.legistar.com/Feed.ashx?GUID=67298C3B-AD29-45AE-AFD5-E0F8CF96B391&amp;ID=8028659&amp;M=LD" rel="self" type="application/atom+xml" /><item><title>Oakland Unified School District - File #: 26-1092</title><link>https://ousd.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=8028659&amp;GUID=67298C3B-AD29-45AE-AFD5-E0F8CF96B391</link><guid isPermaLink="false">67298C3B-AD29-45AE-AFD5-E0F8CF96B391-2026-05-29-18-39-59</guid><description>Title: Approval by the Board of Education of Change Order No. 1, Agreement Between Owner and Contractor by and between the District and Tulum Innovative Engineering, Inc., Oakland, CA, for the latter to provide additional scope based on OUSD’s direction and unforeseen site conditions, including asbestos-contaminated soil excavation and disposal; additional asphalt removal and overtime for seal coating; Tulum overtime and double-time for dry creek installation; additional Protective Industrial Product (PIP) safety surfacing; additional preparation and painting at exterior walls; and additional weeks of air monitoring for KABOOM, and premium time due to late start, as identified in Potential Change Order (PCO’s) Nos. 2 thru 4 and Nos. 6 thru 9, for the Joaquin Miller Elementary Site Improvements Project, in the not-to-exceed amount of $203,565.90, increasing the Agreement not to exceed amount from $598,634.00 to $802,199.90.  All other terms and conditions of the Agreement remain in full force and effect.</description><pubDate>Fri, 29 May 2026 18:39:59 GMT</pubDate></item></channel></rss>