Meeting Name: Facilities Committee Agenda status: Final
Meeting date/time: 6/15/2010 5:00 PM Minutes status: Final  
Meeting location: Board Room, Paul Robeson Building, 1025 2nd Avenue, Oakland, CA 94606-2212
Published agenda: Agenda Agenda Published minutes: Minutes Minutes  
Meeting video: eComment: Not available  
Attachments:
File #Ver.Agenda #NameTypeTitleActionResultAction DetailsVideo
10-1508 1 Professional Services Facilities Contract - Schirmer Engineering - Golden Gate Fire Alarm Replacement Project Agreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and Schirmer Engineering, Concord, CA, for the latter to provide design and construction administration services, with the attached proposal incorporated into the contract to the extent that it is subordinate to and not inconsistent with the contract terms, in conjunction with the Golden Gate Fire Alarm Replacement Project for the period commencing June 30, 2010 and concluding no later than December 31, 2011 in an amount not to exceed $15,200.00.Recommended FavorablyPass Roll call Not available
10-1510 1 Professional Services Facilities Contract - Schirmer Engineering - Harriet Tubman CDC Fire Alarm Replacement Project Agreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and Schirmer Engineering, Concord, CA, for the latter to provide design and construction administration services, with the attached proposal incorporated into the contract to the extent that it is subordinate to and not inconsistent with the contract terms, in conjunction with the Harriet Tubman CDC Fire Alarm Replacement Project for the period commencing June 30, 2010 and concluding no later than December 31, 2011 in an amount not to exceed $15,200.00.Recommended FavorablyPass Action details Not available
10-1511 1 Professional Services Facilities Contract - Schirmer Engineering - Lockwood Fire Alarm and Intrusion Alarm Replacement Project Agreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and Schirmer Engineering, Concord, CA, for the latter to provide design and construction administration services, with the attached proposal incorporated into the contract to the extent that it is subordinate to and not inconsistent with the contract terms, in conjunction with the Lockwood Fire Alarm and Intrusion Alarm Replacement Project for the period commencing June 30, 2010 and concluding no later than December 31, 2011 in an amount not to exceed $77,700.00.Recommended FavorablyPass Action details Not available
10-1512 1 Professional Services Facilities Contract - Schirmer Engineering - Piedmont CDC Fire Alarm Replacement Project Agreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and Schirmer Engineering, Concord, CA, for the latter to provide design and construction administration services, with the attached proposal incorporated into the contract to the extent that it is subordinate to and not inconsistent with the contract terms, in conjunction with the Piedmont CDC Fire Alarm Replacement Project for the period commencing June 30, 2010 and concluding no later than December 31, 2011 in an amount not to exceed $13,600.00.Recommended FavorablyPass Action details Not available
10-1513 1 Professional Services Facilities Contract - Schirmer Engineering - Manzanita CDC Fire Alarm Replacement Project Agreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and Schirmer Engineering, Concord, CA, for the latter to provide design and construction administration services, with the attached proposal incorporated into the contract to the extent that it is subordinate to and not inconsistent with the contract terms, in conjunction with the Manzanita CDC Fire Alarm Replacement Project for the period commencing June 30, 2010 and concluding no later than December 31, 2011 in an amount not to exceed $13,600.00.Recommended FavorablyPass Action details Not available
10-1514 1 Professional Services Facilities Contract - Schirmer Engineering - Jefferson CDC Fire Alarm Replacement Project Agreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and Schirmer Engineering, Concord, CA, for the latter to provide design and construction administration services, with the attached proposal incorporated into the contract to the extent that it is subordinate to and not inconsistent with the contract terms, in conjunction with the Jefferson CDC Fire Alarm Replacement Project for the period commencing June 30, 2010 and concluding no later than December 31, 2011 in an amount not to exceed $15,200.00.Recommended FavorablyPass Action details Not available
10-1515 1 Professional Services Facilities Contract - Schirmer Engineering - Highland CDC Fire Alarm Replacement Project Agreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and Schirmer Engineering, Concord, CA, for the latter to provide design and construction administration services, with the attached proposal incorporated into the contract to the extent that it is subordinate to and not inconsistent with the contract terms, in conjunction with the Highland CDC Fire Alarm Replacement Project for the period commencing June 30, 2010 and concluding no later than December 31, 2011 in an amount not to exceed $13,600.00.Recommended FavorablyPass Action details Not available
10-1516 1 Professional Services Facilities Contract - Schirmer Engineering - Yuk Yau CDC Fire Alarm Replacement Project Agreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and Schirmer Engineering, Concord, CA, for the latter to provide design and construction administration services, with the attached proposal incorporated into the contract to the extent that it is subordinate to and not inconsistent with the contract terms, in conjunction with the Yuk Yau CDC Fire Alarm Replacement Project for the period commencing June 30, 2010 and concluding no later than December 31, 2011 in an amount not to exceed $15,200.00.Recommended FavorablyPass Action details Not available
10-1517 1 Professional Services Facilities Contract - Schirmer Engineering - Centro Infantil CDC Fire Alarm Replacement Project Agreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and Schirmer Engineering, Concord, CA, for the latter to provide design and construction administration services, with the attached proposal incorporated into the contract to the extent that it is subordinate to and not inconsistent with the contract terms, in conjunction with the Centro Infantil CDC Fire Alarm Replacement Project for the period commencing June 30, 2010 and concluding no later than December 31, 2011 in an amount not to exceed $15,200.00.Recommended FavorablyPass Action details Not available
10-1518 1 Professional Services Facilities Contract - Simplex Grinnell - Montera Middle School Modernization ProjectAgreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and Simplex Grinnell, Livermore, CA, for the latter to provide verification of proper fire alarm installation in conjunction with the Montera Middle School Modernization Project for the period commencing June 24, 2010 and concluding no later than November 30, 2011 in an amount not to exceed $21,600.00Recommended FavorablyPass Action details Not available
10-1519 1 Professional Services Facilities Contract - Simplex Grinnell - Sobrante Park Classroom 1 Fire Repair Project Agreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and Simplex Grinnell, Livermore, CA, for the latter to provide supervision to the electrical contractor and/or low-voltage installer of the fire alarm system during critical path periods of conduit installation, wire pulling, wire continuity review testing and termination/trimming of devices in conjunction with the Sobrante Park Classroom 1 Fire Repair Project for the period commencing June 24, 2010 and concluding no later than June 30, 2011 in an amount not to exceed $6,480.00.Recommended FavorablyPass Action details Not available
10-1520 1 Professional Services Facilities Contract - Simplex Grinnell - Madison Middle School Health Center ProjectAgreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and Simplex Grinnell, Livermore, CA, for the latter to provide supervision to the electrical contractor and/or low-voltage installer of the fire alarm system during critical path periods of conduit installation, wire pulling, wire continuity review testing and termination/trimming of devices in conjunction with the Madison Middle School Health Center Project for the period commencing June 24, 2010 and concluding no later than June 30, 2011 in an amount not to exceed $6,480.00.Recommended FavorablyPass Action details Not available
10-1521 1 Professional Services Facilities Contract - Simplex Grinnell - Claremont Plumbing Renovation Project Agreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and Simplex Grinnell, Livermore, CA, for the latter to provide supervision to the electrical contractor and/or low-voltage installer of the fire alarm system during critical path periods of conduit installation, wire pulling, wire continuity review testing and termination/trimming of devices in conjunction with the Claremont Plumbing Renovation Project for the period commencing June 24, 2010 and concluding no later than October 1, 2010 in an amount not to exceed $3,780.00.Recommended FavorablyPass Action details Not available
10-1522 1 Professional Services Facilities Contract - Simplex Grinnell - Elmhurst Middle School Modernization-Auditorium Project Agreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and Simplex Grinnell, Livermore, CA, for the latter to provide supervision to the electrical contractor and/or low-voltage installer of the fire alarm system during critical path periods of conduit installation, wire pulling, wire continuity review testing and termination/trimming of devices in conjunction with the Elmhurst Middle School Modernization-Auditorium Project for the period commencing June 24, 2010 and concluding no later than December 31, 2011 in an amount not to exceed $16,200.00.Recommended FavorablyPass Action details Not available
10-1523 1 Professional Services Facilities Contract - Simplex Grinnell - Lowell Middle School Modernization ProjectAgreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and Simplex Grinnell, Livermore, CA, for the latter to provide supervision to the electrical contractor and/or low-voltage installer of the fire alarm system during critical path periods of conduit installation, wire pulling, wire continuity review testing and termination/trimming of devices in conjunction with the Lowell Middle School Modernization Project for the period commencing June 24, 2010 and concluding no later than October 1, 2010 in an amount not to exceed $12,960.00.Recommended FavorablyPass Action details Not available
10-1524 1 Professional Services Facilities Contract - American Consulting Engineer Electrical, Inc. - Downtown Educational Complex Project Agreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and American Consulting Engineer Electrical, Inc., Santa Clara, CA, for the latter to provide electrical design and engineering for the proposed fourteen (14) data racks at the New Data Center, with the attached proposal incorporated into the contract to the extent that it is subordinate to and not inconsistent with the contract terms, in conjunction with the Downtown Educational Complex Project for the period commencing June 24, 2010 and concluding no later than December 31, 2011 in an amount not to exceed $35,800.00.Recommended FavorablyPass Action details Not available
10-1525 1 Professional Services Facilities Contract - Loving and Campos Architects, Inc. - Downtown Educational Complex Project Agreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and Loving and Campos Architects, Inc., Oakland, CA, for the latter to provide design and engineering for five (5) new data racks at the existing Data Center currently located at the Harper Building, with the attached proposal is incorporated into the contract to the extent that it is subordinate to and not inconsistent with the contract terms, in conjunction with the Downtown Educational Complex Project for the period commencing June 24, 2010 and concluding no later than June 23, 2011 in an amount not to exceed $4,905.00.Recommended FavorablyPass Action details Not available
10-1526 1 Professional Services Facilities Contract - Consolidated Engineering Laboratories - Claremont Middle School Restroom Renovation Project Agreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and Consolidated Engineering Laboratories, Oakland, CA, for the latter to provide materials testing and construction inspection services in conjunction with the Claremont Middle School Restroom Renovation Project for the period commencing June 24, 2010 and concluding no later than October 1, 2010 in an amount not to exceed $4,315.00.Recommended FavorablyPass Action details Not available
10-1531 1 Award of Bid and Construction Contract - A & E Emaar - Havenscourt Middle School Phase 1 Temporary Classrooms ProjectResolutionApproval by the Board of Education of Resolution No. 0910-0261 - Award of Bid and Construction Contract between District and A & E Emaar, Albany, CA, for the latter as the lowest responsive, responsible bidder and rejecting all other bids, if any, provide installation infrastructure to support six temporary classroom portables and various other items described herein in conjunction with the Havenscourt Middle School Phase 1 Temporary Classrooms Project for the period commencing June 24, 2010 and ending August 22, 2011 in the amount of $350,000.00.Recommended FavorablyPass Action details Not available
10-1532 1 Award of Bid and Construction Contract - Albay Construction Co. - Madison Middle School Health Center ProjectResolutionApproval by the Board of Education of Resolution No. 0910-0263 - Award of Bid and Construction Contract between District and Albay Construction Co., Martinez, CA, for the latter as the lowest responsive, responsible bidder and rejecting all other bids, if any, convert an existing classroom into a Health Center and renovate an existing computer lab. Scope will include minor demolition, hazardous waste abatement and various other items described herein in conjunction with the Madison Middle School Health Center Project for the period commencing June 24, 2010 and ending December 31, 2011 in the amount of $844,000.00.Recommended FavorablyPass Action details Not available
10-1533 1 Award of Bid and Construction Contract - Alten Construction - Montera Middle School Modernization ProjectResolutionApproval by the Board of Education of Resolution No. 0910-0264 - Award of Bid and Construction Contract between District and Alten Construction, Richmond, CA, for the latter as the lowest responsive, responsible bidder and rejecting all other bids, if any, provide modernization of the entire campus, painting, fire alarm, plumbing, flooring, data and phones in conjunction with the Montera Middle School Modernization Project for the period commencing June 24, 2010 and ending August 26, 2011 in the amount of $6,578,140.00. [Enter body here.]Recommended FavorablyPass Action details Not available
10-1534 1 Award of Bid and Construction Contract - Alten Construction - Montera Middle School Fire Alarm ProjectResolutionApproval by the Board of Education of Resolution No. 0910-0258 - Award of Bid and Construction Contract between District and Alten Construction, Richmond, CA, for the latter as the lowest responsive, responsible bidder and rejecting all other bids, if any, provide modernization of the entire campus fir alarm replacement in conjunction with the Montera Middle School Fire Alarm Project for the period commencing June 24, 2010 and ending August 26, 2011 in the amount of $714,300.00.Recommended FavorablyPass Action details Not available
10-1535 1 Award of Bid and Construction Contract - Beliveau Engineering Contractors, Inc. - Glenview Lower Play Yard Paving and Accessible Ramp ProjectResolutionApproval by the Board of Education of Resolution No. 0910-0262 - Award of Bid and Construction Contract between District and Beliveau Engineering Contractors, Inc., Oakland, CA, for the latter as the lowest responsive, responsible bidder and rejecting all other bids, if any, provide construction services in conjunction with the Glenview Lower Play Yard Paving and Accessible Ramp Project for the period commencing June 28, 2010 and ending September 3, 2010 in the amount of $714,000.00.Recommended FavorablyPass Action details Not available
10-1537 1 Award of Bid and Construction Contract - Petersen Dean Commercial, Inc. - Burbank Elementary School Roofing ProjectResolutionApproval by the Board of Education of Resolution No. 0910-0260 - Award of Bid and Construction Contract between District and Petersen Dean Commercial, Inc., Newark, CA, for the latter as the lowest responsive, responsible bidder and rejecting all other bids, if any, provide replacement of the existing roofs The project includes removal and replacement of the roofs which includes the abatement of the insulation and roofing, new skylights, installation of single ply roofing, composition asphalt shingle roof and accessories in conjunction with the Burbank Elementary School Roofing Project for the period commencing June 24, 2010 and ending August 8, 2010 in the amount of $471,000.00.Recommended FavorablyPass Action details Not available
10-1538 1 Award of Bid and Construction Contract - Petersen Dean Commercial, Inc. - Marshall Elementary School Roofing ProjectResolutionApproval by the Board of Education of Resolution No. 0910-0259 - Award of Bid and Construction Contract between District and Petersen Dean Commercial, Inc., Newark, CA, for the latter as the lowest responsive, responsible bidder and rejecting all other bids, if any, provide replacement of the existing roofs The project includes removal and replacement of the roofs which includes the abatement of the insulation and roofing, new skylights, installation of single ply roofing, composition asphalt shingle roof and accessories in conjunction with the Marshall Elementary School Roofing Project for the period commencing June 24, 2010 and ending August 8, 2010 in the amount of $449,000.00.Recommended FavorablyPass Action details Not available
10-1539 1 Award of Bid and Construction Contract - Riverview Construction - Prescott Elementary School Modernization ProjectResolutionApproval by the Board of Education of Resolution No. 0910-0263 - Award of Bid and Construction Contract between District and Riverview Construction, W. Sacramento, CA, for the latter as the lowest responsive, responsible bidder and rejecting all other bids, if any, provide demolition and removal of nine (9) portable buildings to provide new parking lot in front of the school, and modernization of existing campus buildings and grounds and various other items described herein in conjunction with the Prescott Elementary School Modernization Project for the period commencing June 24, 2010 and ending August 20, 2010 in the amount of $2,150,000.00.Recommended FavorablyPass Action details Not available
10-1540 1 Award of Bid and Construction Contract - Rodan Builders - Lowell Middle School Modernization ProjectResolutionApproval by the Board of Education of Resolution No. 0910-0257 - Award of Bid and Construction Contract between District and Rodan Builders, Belmont, CA, for the latter as the lowest responsive, responsible bidder and rejecting all other bids, if any, to provide demolition of snack shop, move restroom portable over to snack shop, connect electrical and plumbing, Trench for low voltage, fire alarm and electricity, in conjunction with the Lowell Middle School Modernization Project, for the period commencing June 24, 2010 and ending October 1, 2010 in the amount of $517,000.00.Recommended FavorablyPass Action details Not available
10-1543 1 Award of Bid and Construction Contract - W. Chapot Construction - Claremont Middle School Plumbing Renovation ProjectResolutionApproval by the Board of Education of Resolution No. 0910-0259 - Award of Bid and Construction Contract between District and W. Chapot Construction, Alameda, CA, for the latter as the lowest responsive, responsible bidder and rejecting all other bids, if any, to provide demolition of the boys and girls restrooms, moving Intermediate Distribution Frame (IDF) to another location within building, including installing new terrazzo flooring, plumbing, ceramic tiles, toilet partitions, ventilation and paint, in conjunction with the Claremont Middle School Plumbing Renovation Project, for the period commencing June 24, 2010 and ending October 1, 2010, in the amount of $339,000.00.Recommended FavorablyPass Action details Not available
10-1550 1 Professional Services Facilities Contract - Geosphere Consultants, Inc. - Lowell Middle School Modernization Project Agreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and Geosphere Consultants, Inc., Oakland, CA, for the latter to provide geotechnical services during the construction phase of Interim Housing project, with the attached proposal is incorporated into the contract to the extent that it is subordinate to and not inconsistent with the contract terms, in conjunction with the Lowell Middle School Modernization Project, for the period commencing June 24, 2010 and concluding no later than December 1, 2010, in an amount not to exceed $9,580.00.Recommended FavorablyPass Action details Not available
10-1551 1 Professional Services Facilities Contract - Michael Willis Architects - McClymonds Youth and Family Center Project Agreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and Michael Willis Architects, Oakland, CA, for the latter to provide roofing engineering fire alarm design, cost estimating, electrical engineering, intrusion design and various other items described herein in conjunction with the McClymonds Youth and Family Center Project for the period commencing June 24, 2010 and concluding no later than October 31, 2010 in an amount not to exceed $37,933.00.Recommended FavorablyPass Action details Not available
10-1552 1 Professional Services Facilities Contract - Ninyo and Moore - Glenview Lower Yard Paving and Accessible Ramp Project Agreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and Ninyo and Moore, Oakland, CA, for the latter to provide materials testing and inspection services for the construction of a new concrete retaining wall, with the attached proposal incorporated into the contract to the extent that it is subordinate to and not inconsistent with the contract terms, in conjunction with the Glenview Lower Yard Paving and Accessible Ramp Project, for the period commencing June 24, 2010 and concluding no later than December 31, 2010, in an amount not to exceed $10,840.00.Recommended FavorablyPass Action details Not available
10-1554 1 Professional Services Facilities Contract - Noodle, Inc. - Hintil KUU CDC Building Replacement Project Agreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and Noodle, Inc., Alamo, CA, for the latter to provide and install one Avaya Partner, ACSR8.0, PVM Voicemail, seven (7) Partner Telesets, five (5) Walmounts, Bogen 35 watt amplified, eight (8) Bogen walmount speakers, with the attached proposal is incorporated into the contract to the extent that it is subordinate to and not inconsistent with the contract terms, in conjunction with the Hintil KUU CDC Building Replacement Project, for the period commencing June 24, 2010 and concluding no later than December 31, 2011, in an amount not to exceed $7,882.04.Recommended FavorablyPass Action details Not available
10-1555 1 Professional Services Facilities Contract - Noodle, Inc. - Stonehurst CDC Building Replacement Project Agreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and Noodle, Inc., Alamo, CA, for the latter to provide and install one Avaya Partner Advanced Communications System R8.0 including five incoming lines, nine extensions, Avaya Partner Voice Messaging with auto attendant, seven Avaya Partner 18 button telephones. The attached proposal is incorporated into the contract to the extent that it is subordinate to and not inconsistent with the contract terms in conjunction with the Stonehurst CDC Building Replacement Project for the period commencing June 24, 2010 and concluding no later than December 31, 2011 in an amount not to exceed $7,575.81.Recommended FavorablyPass Action details Not available
10-1556 1 Professional Services Facilities Contract - Noodle, IC. - Laurel CDC Building Replacement Project Agreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and Noodle, Inc., Alamo, CA, for the latter to provide and install (1) Avaya Partner, ACSRM8.0, PVM Voicemail, nine (9) Partner Telesets, seven (7) Walmounts, Bogen 35 watt amplifier, with the attached proposal is incorporated into the contract to the extent that it is subordinate to and not inconsistent with the contract terms, in conjunction with the Laurel CDC Building Replacement Project, for the period commencing June 24, 2010 and concluding no later than December 31, 2011, in an amount not to exceed $7,882.04.Recommended FavorablyPass Action details Not available
10-1558 1 Professional Services Facilities Contract - Nor-Cal Moving Services - Various SitesAgreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and Nor-Cal Moving Services, Oakland, CA, for the latter to provide moving services for various schools District-wide in conjunction with the Various Projects for the period commencing June 24, 2010 and concluding no later than June 30, 2011 in an amount not to exceed $245,000.00.Recommended FavorablyPass Action details Not available
10-1559 1 Professional Services Facilities Contract - Simplex Grinnell - Havenscourt New Classroom and Cafeteria Building Project Agreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and Simplex Grinnell, Livermore, CA, for the latter to provide supervision to the electrical contractor and/or low voltage installer for the fire alarm system and various other items described herein in conjunction with the Havenscourt New Classroom and Cafeteria Building Project for the period commencing June 24, 2010 and concluding no later than June 30, 2011 in an amount not to exceed $21,600.00.Recommended FavorablyPass Action details Not available
10-1560 1 Amendment No. 1, Professional Services Contract- Jason Zalinski - Life Academy Renovation Seismic Retrofit Project Agreement or ContractApproval by the Board of Education of Amendment No. 1 to Professional Services Agreement between District and Jason Zalinski, Oakland, CA, for the latter to provide additional Division of State Architect (DSA) inspection in conjunction with the Life Academy Renovation Seismic Retrofit Project in an additionl amount not to exceed $8,100.00, increasing the Agreement from a not to exceed amount of $14,400.00 to $22,500.00. All other terms and conditions of the Agreement remain in full force and effect.Recommended FavorablyPass Action details Not available
10-1563 1 Amendment No. 1, Professional Services Contract - Jason Zalinski - Chabot New Classroom and Multi-Purpose Building Project Agreement or ContractApproval by the Board of Education of Amendment No. 1 to Professional Services Agreement between District and Jason Zalinski, Oakland, CA, for the latter to provide additional Division of State Architect (DSA) inspection in conjunction with the Chabot New Classroom and Multi-Purpose Building Project in an additional amount not to exceed $45,000.00, increasing the Agreement from a not to exceed amount of $227,200.00 to $272,200.00, and extending the end date from December 31, 2008 to September 30, 2011. All other terms and conditions of the Agreement remain in full force and effect.Recommended FavorablyPass Action details Not available
10-1564 1 Amendment No. 1, Professional Services Contract - Professional Service Industries (PSI) Engineering - Montclair New Classroom Building New Classroom Portables Project Agreement or ContractApproval by the Board of Education of Amendment No. 1 to Professional Services Agreement between District and Professional Service Industries (PSI) Engineering, Oakland, CA, for the latter to provide drilling boring for geological study of soils at the new two story building, with the attached proposal is incorporated into the contract to the extent that it is subordinate to and not inconsistent with the contract terms, in conjunction with the Montclair New Classroom Building New Classroom Portables Project, in an amount not to exceed $10,639.00, increasing the Agreement from $2,500.00 to a not-to-exceed amount of $13,139.00. All other terms and conditions of the Agreement remain in full force and effect.Recommended FavorablyPass Action details Not available
10-1565 1 Amendment No. 1. Professional Services Contract - Sensible Environmental Solutions - Lowell Middle School Modernization Project Agreement or ContractApproval by the Board of Education of Amendment No. 1 to Professional Services Agreement between District and Sensible Environmental Solutions, Oakland, CA, for the latter to provide additional hazardous materials abatement design services in conjunction with the Lowell Middle School Modernization Project in an additional amount not to exceed $99,591.25, increasing the Agreement from a not to exceed amount of $10,391.00 to $109,982.25, and extending the end date from June 24, 2010 to September 1, 2012. All other terms and conditions of the Agreement remain in full force and effect.Recommended FavorablyPass Action details Not available
10-1568 1 Amendment No. 1, Professional Services Contract - Testing Engineers - Cox New Classroom Building Project Agreement or ContractApproval by the Board of Education of Amendment No. 1 to Professional Services Agreement between District and Testing Engineers, San Leandro, CA, for the latter to provide additional Division of State Architect (DSA) special inspection in conjunction with the Cox New Classroom Building Project in an additional amount not to exceed $30,858.00, increasing the Agreement from not to exceed amount of $60,332.00 to $91,190.00, and extending the end date from Mary 14, 2010 to December 31, 2011. All other terms and conditions of the Agreement remain in full force and effect.Recommended FavorablyPass Action details Not available
10-1574 1 Professional Services Facilities Contract - Davillier-Sloan - Division of Facilities, Planning and Management Project Agreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and Davillier-Sloan, Oakland, CA, for the latter to provide a full range of services related to the Project Labor Agreement (PLA) for the Oakland Unified School District with a primary focus on local hiring, with the attached proposal is incorporated into the contract to the extent that it is subordinate to and not inconsistent with the contract terms, in conjunction with the Division of Facilities, Planning and Management Project, for the period commencing July 1, 2010 and concluding no later than June 30, 2011, in an amount not to exceed $180,000.00.Recommended FavorablyPass Action details Not available
10-1575 1 Professional Services Facilities Contract - Noodle, Inc. - Arroyo Viejo CDC Replacement Project Agreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and Noodle, Inc., Alamo, CA, for the latter to install one Avaya Partner, ACSR8.0, PVM Voicemail, (7) Partner Telsets, (5) walmounts, Bogen 35 watt amplifier, (8) Bogen walmount speakers, with the attached proposal is incorporated into the contract to the extent that it is subordinate to and not inconsistent with the contract terms, in conjunction with the Arroyo Viejo CDC Replacement Project, for the period commencing June 24, 2010 and concluding no later than December 31, 2011, in an amount not to exceed $7,575.81.Recommended FavorablyPass Action details Not available
10-1576 1 Professional Services Facilities Contract - Schirmer Engineering - Cesar Chavez Education Center Project Agreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and Schirmer Engineering, Concord, CA, for the latter to provide design and construction administration services, with the attached proposal incorporated into the contract to the extent that it is subordinate to and not inconsistent with the contract terms, in conjunction with the Cesar Chavez Education Center Fire Alarm Renovation Project for the period commencing June 30, 2010 and concluding no later than December 31, 2011 in an amount not to exceed $54,400.00.Recommended FavorablyPass Action details Not available
10-1577 1 Professional Services Facilities Contract - Schirmer Engineering - Washington Small School Conversion Project Agreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and Schirmer Engineering, Concord, CA, for the latter to provide design and construction administration services, with the attached proposal incorporated into the contract to the extent that it is subordinate to and not inconsistent with the contract terms, in conjunction with the Washington Small School Fire Alarm Conversion Project for the period commencing June 30, 2010 and concluding no later than December 31, 2011 in an amount not to exceed $70,400.00.Recommended FavorablyPass Roll call Not available
10-1597 1 Professional Services Facilities Contract - Concordia LLC - West Oakland Schools ProjectAgreement or ContractApproval by the Board of Education of a Professional Services Facilities Contract between District and Concordia L.L.C, for the latter to conduct a community-based planning project for the development of West Oakland public schools in the context of the neighborhood and how these schools impact the District's facilities planning and budgets for capital investiment, as further described in contract document, for the period commencing June 24, 2010 and concluding no later than February 3, 2011, in an amount not to exceed $210,090.00. Postponed   Action details Not available
10-1598 1 Amendment No. 1, Professional Services Facilities Contract-Berkeley Geo Research Group - District-wide Demographic ProjectAgreement or ContractApproval by the Board of Education of Amendment No.1 between District and Berkeley Geo Research Group, for the latter to provide additional demographic services for the District-wide Demographic Project, revising the end date from June 30, 2010 to June 30, 2011, at no additional cost to the District. All rother terms and conditions of the Agreement remain in full force and effect.Recommended FavorablyPass Action details Not available
10-1609 1 Project Budget, Key Code and Project Number McClymonds Youth and Family Center (MYCA) ProjectResolutionApproval by the Board of Education of Resolution 0910-0268 - Authorizing and approving the New Project Budget, Key Code and Project Number for McClymonds Youth and Family Center (MYCA) Project in the amount of $473,707.00.Recommended FavorablyPass Action details Not available
10-1610 1 Project Budget Increase - Glenview Lower Yard Paving and Retaining Wall ProjectResolutionApproval by the Board of Education of Resolution 0910-0267 - Authorizing and approving the Project Budget Increase for the Glenview Lower Yard Paving and Retaining Wall Project, in the additional amount of $225,000.00, increasing the current budget amount from $615,835.00 to $840,835.00.Recommended FavorablyPass Action details Not available
10-1611 1 Project Budget Decrease - Edna Brewer Restroom Plumbing Renovation ProjectResolutionApproval by the Board of Education of Resolution 0910-0266 - Authorizing and approving the Project Budget Decrease for the Edna Brewer Restroom Plumbing Renovation Project, in the amount of $225,000.00, decreasing the current amount from $734,250.00 to $509,250.00Recommended FavorablyPass Action details Not available
10-1612 1 Change Order No. 5 - Focon, Inc. - Stonehurst Small School Conversion ProjectAgreement or ContractApproval by the Board of Education of Change Order No. 5 to Construction Contract with Focon, Inc., Oakland, CA, for the latter to include the cost of the signs that were required by the Oakland Fire Marshall and Division of State Architect, but the specification section for the signs was not included in the contract documents in conjunction with the Stonehurst Small School Conversion Project, in the additional amount of $298.71, increasing the current contract amount from $249,910.99 to $250,209.71.Recommended FavorablyPass Action details Not available
10-1614 1 Professional Services Facilities Contract - Mobile Modular - Lowell Middle School Modernization Project Agreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and Mobile Modular, Livermore, CA, for the latter to supply and install six used 24' x 40' classroom portables, in conjunction with the Lowell Middle School Modernization Project for the period commencing July 20, 2010 and concluding no later than January 31, 2012 in an amount not to exceed $114,462.00.Recommended FavorablyPass Action details Not available
10-1631 1 Professional Services Facilities Contract - ACC Environmental - Marshall Roofing Replacement Project Agreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and ACC Environmental, Oakland, CA, for the latter to provide environmental inspection services, which includes specifications, air monitoring and project management, with the attached proposal incorporated into the contract to the extent that it is subordinate to and not inconsistent with the contract terms, in conjunction with the Marshall Roofing Replacement Project, for the period commencing June 24, 2010 and concluding no later than August 20, 2010, in an amount not to exceed $6,000.00.Recommended FavorablyPass Action details Not available
10-1632 1 Professional Services Facilities Contract - ACC Environmental - Burbank Roofing Replacement Project Agreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and ACC Environmental, Oakland, CA, for the latter to provide environmental inspection services, which includes specifications, air monitoring and project management, with the attached proposal incorporated into the contract to the extent that it is subordinate to and not inconsistent with the contract terms in conjunction with the Burbank Roofing Replacement Project for the period commencing June 24, 2010 and concluding no later than August 20, 2010 in an amount not to exceed $6,000.00.Recommended FavorablyPass Action details Not available
10-1633 1 Professional Services Facilities Contract - AEKO - Division of Facilities Planning and Management Project Agreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and AEKO, Oakland, CA, for the latter to provide to include support services for all components on the Local Area Network (LAN), with the attached proposal incorporated into the contract to the extent that it is subordinate to and not inconsistent with the contract terms, in conjunction with the Division of Facilities Planning and Management Project, for the period commencing July 1, 2010 and concluding no later than June 30, 2011, in an amount not to exceed $105,600.00.Recommended FavorablyPass Action details Not available
10-1634 1 Professional Services Facilities Contract - American Consulting Engineer Electrical, Inc. - Downtown Educational Complex Project Agreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and American Consulting Engineer Electrical, Inc., Santa Clara, CA, for the latter to provide electrical design and engineering for the proposed fourteen (14) data racks at the New Data Center, including Design that will include layout of the data racks and equipment based on the current design from the Infrastructure Engineer, with the attached proposal is incorporated into the contract to the extent that it is subordinate to and not inconsistent with the contract terms, in conjunction with the Downtown Educational Complex Project, for the period commencing June 24, 2010 and concluding no later than December 31, 2011, in an amount not to exceed $35,800.00. Recommended FavorablyPass Action details Not available
10-1635 1 Contract for Purchase, Delivery and Installation of Server Equipment - New Data Center - CDW Government - Downtown Educational Complex Project Agreement or ContractApproval by the Board of Education of Contract for Purchase, Delivery and Installation of Server Equipment - New Data Center - between District and CDW Government, Chicago, IL, for the latter to provide service equipment and software support the New Data Center, located as part of the Downtown Education Complex facility, with Scope including customer support as well as server set up and training, in conjunction with the Downtown Educational Complex Project, for the period commencing June 24, 2010 and concluding no later than December 31, 2011, in an amount not to exceed $721,251.75.Recommended FavorablyPass Action details Not available
10-1636 1 Contract for Purchase, Delivery and Installation of Server Equipment - CDW Government - Downtown Educational Complex Project Agreement or ContractApproval by the Board of Education of Contract for Purchase, Delivery and Installation of Server Equipment and CDW Government, Chicago, IL, for the latter to provide server equipment and software support to back up data center, also referred to as the "hot site" located at Cole Middle School, including customer support as well as installation, in conjunction with the Downtown Educational Complex Project, for the period commencing June 24, 2010 and concluding no later than December 31, 2011, in an amount not to exceed $558,629.17.Recommended FavorablyPass Action details Not available
10-1637 1 Professional Services Facilities Contract - Jason Zalinski - Highland New Classroom Building ProjectAgreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and Jason Zalinski, Oakland, CA, for the latter to provide Division of State Architect Inspection services, in conjunction with the Highland New Classroom Building Project, for the period commencing July 1, 2010 and concluding December 31, 2012, in an amount not to exceed $295,200.00.Recommended FavorablyPass Action details Not available
10-1638 1 Professional Services Facilities Contract - Jason Zalinski - Elmhurst Auditorium Modernization Project Agreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and Jason Zalinski, Oakland, CA, for the latter to provide Division of State Architect Inspection in conjunction with the Elmhurst Auditorium Modernization Project for the period commencing June 24, 2010 and concluding no later than December 31, 2012 in an amount not to exceed $94,500.00.Recommended FavorablyPass Action details Not available
10-1639 1 Professional Services Facilities Contract - Ninyo and Moore - Edna Brewer Restroom Plumbing Renovation Project Agreement or ContractApproval by the Board of Education of Professional Services Facilities Contract between District and Ninyo and Moore, Oakland, CA, for the latter to provide materials testing services for expansion/wedge anchors and provide a final verified report for submission to Division of State Architect in conjunction with the Edna Brewer Restroom Plumbing Renovation Project for the period commencing June 24, 2010 and concluding no later than December 31, 2011 in an amount not to exceed $985.00.Recommended FavorablyPass Action details Not available
10-1640 1 Amendment No. 1, Professional Services Contract - Mobile Modular - Chabot New Classroom Replacement Project Agreement or ContractApproval by the Board of Education of Amendment No. 1 to Professional Services Agreement between District and Mobile Modular, Livermore, CA, for the latter to provide two additional TMP ramps for the duration of the rental agreement, extend the leasing agreement for each nine (9) properties by nine months, and add escalation cost due to the contract extending beyond the original agreement in conjunction with the Chabot New Classroom Replacement Project in an additional amount not to exceed $94,025.00, increasing the Agreement from a not to exceed amount of $153,714.00 to $247,025.00, and extending the end date from April 18, 2008 to April 30, 2010. All other terms and conditions of the Agreement remain in full force and effect.Recommended FavorablyPass Action details Not available
10-1645 1 Agreement for Solid Waste Handing and Recycling Services - Waste Management of Alameda Country, Inc. - District-wide Waste Management Project Agreement or ContractApproval by the Board of Education of Agreement for Solid Waste Handing and Recycling Services between District and Waste Management of Alameda Country, Inc., Oakland, CA, for the latter to furnish to the District solid waste handling services, recycling services, preparation and implementation of a comprehensive SWMP, and advice, as further described in Exhibit A attached hereto and incorporated herein in by reference ("Services") in conjunction with the District-wide Project for the period commencing July 1, 2010 and concluding no later than June 30, 2015 in an amount not to exceed $8,320,293.00.Recommended FavorablyPass Action details Not available
10-0895 2 Report - Funding of Certain Retained Positions - Buildings and Grounds Department - Fiscal Year 2010-11MotionReport from the Assistant Superintendent of Facilities, Buildings and Grounds, Custodial Services regarding funding of certain B&G positions rescended from the budget "cut" list for 2010-11 Fiscal Year.Discussed  Action details Video Video
10-1595 1 Interim Progress Report No. 5 - Oakland Unified School District - CHPS Program/Sustainability MotionApproval by the Board of Education of the Fifth Interim Progress Report on Oakland Unified School District California High Performance School (CHPS) Program/Sustainability Initiatives and Energy and Water Board Resolution.Postponed to a Date Certain  Action details Video Video
10-1678 2 Professional Services Agreement - GKK McCarthy - Division of Facilities, Planning and Management Project Agreement or ContractApproval by the Board of Education of Professional Services Agreement between District and GKK McCarthy, Irvine, CA, for the latter to provide Construction Management and Project Management Services, as describe in the Scope of Work, in conjunction with the Division of Facilities, Planning and Management, for the period July 1, 2010 through June 30, 2011, at a cost not to exceed $3,373,150.00.Recommended FavorablyPass Action details Video Video